Loading...
4B-R-05-35 - 5/24/2005 RESOLUTION NO. 05-35 WHEREAS, the Round Rock Transportation System Development ' Corporation ("RRTSDC") has previously adopted a Transportation Capital Improvement Plan ("Plan") , and . • WHEREAS, the RRTSDC wishes to amend said Plan, Now Therefore BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THE ROUND ROCK TRANSPORTATION SYSTEM DEVELOPMENT CORPORATION, That the amendment to the Transportation Capital Improvement Plan for the Round Rock Transportation System Development Corporation, attached hereto as Exhibit "A" , is hereby approved. The Board of Directors hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this •�- i day of May, 2005 . ROUND ROCK TRANSPORTAT. Y M DEVELOP - T By. f.riWELL, President ATTEST: , Secretary @PFDesktop\::ODMA/WORLDOX/O:/WDOX/RESOLUTI/RRTSDC/0035.WPD/sc 2003 TRANSPORTATION CAPITAL IMPROVEMENTS PROGRAM ROUND ROCK TRANSPORTATION SYSTEM DEVELOPMENT CORPORATION b� ni�.-.u<•, 7. . c �tz *4%1f %1%ex,Ati��U.N.5 , .7 � . ,nM�,- ,�.w,? .h 41,0, argil c , ur i .{. °fs l1���ice , �/���ArM. �,c,{3 41 , Q6rp,Fh3 e 4: , Famu iw 1 41i , r.>f,:;$'��f � ��w,r��; rw$. �• . 4� ,�r�. b � %.h:Ayfi w1om��wav .�� flP*�o �os�M wg ,n� ���,xwe� a70 , .: ��1Mr�»«r$M , �, F^�a� a�t , � « 2k�cae' ,00: � �C.���ti; � :aa�,� �wo re� i. Preliminary ts to establish alignment WA Medal A From US 79 to Forest Creek Drive and ROW requirements.Protective ROW . purchase Forest Creak From Double Geek Drive to 900'Weal of Forest Fall 2004 $3,008.178 $1,284,528 0 $4,379,318 Ridge Subdivision $77,814 e Pot 2004 32,650,000 $2,650,000 Double Creek Drive From Gags School Rd to MKT ROW AW.Grime.Blvd(Arterial B) From US 79 to Louts Henna BlvdFall 2000 521,082,359 57,862,701 ° $24,052,476 $281,000 $1,007,380 e Acquire ROW for Arterial C and construct Summer 2007 $0 SC -5800,000 Arterial C From RM 62010 Sam Boss Rd bicycle/sidewalk facility to accees high school and swimming pool Design,purchase right-ot•way and construct 4 Fall 2008 $11,168,908 $289,823 b $12,510,311 $3,821,558 Kiphen Rood(CR 113) Front FM 1480 to CR 122 lane divided arterial 51.000,000 d 551,582 e Acquire ROW for hignw°y relocation Fall 2003 $800,000 58,200,000 a $6,800,000 ' FM 1480 From US 7010 1200'N of US 79 Construct 4 lane°hided arterial Complete $3,896,180 $88,633 b $4,331,861 -$128,811 Oreentawn Extension From Louts Henna Blvd to IM 35 Frontage Road 6547,138 e Construct OreeNawn Interchange with IH 35 Not Scheduled $0 $12,000,000 a 212,000,000 -$6,000,000 Oreenlawn Interchange AIN 36 Construct frontage road turnarounds Completed $3,633,682 $3,175,000 a $7,036,682 IM 35 Turnarounds FM 1325/Louis Hennahlester'9 Crossing $328,000 e I, 1 Relocate ramps,widen frontage road,and Summer 2004 $6,288,090 54,042,788 a 212,311,658 5418,431 $1,0150,859 FMrTa`111 IH 35 Area Improvement. from Westinghouse Road to FM 1431 construct frontage road turnaround h.y IH 35 Frontage Rd 043 and Hester'°Crowing Construct Frontage road colleelo"tllelribular end Winter 2006 $9,780,000 $8,780,000 s.ay IH 35 @ Hester's Crossing replace Hester's Crossing Bridge 32,730,000 W Bridge Replacement ~ Alternatives to alleviate congestion N/A $87,400 $87,40[ •"i Feasibility Study 111-35 8 RM 820 end IH 35 5 US 79 Construct 44ane divided roadway Summer 2005 $2,200,000 $2,200,000 $2,200,000 Oakmont Drive(Arterial"S') From Taranto/.to Cnardter Road V Assist City In interagency coordination for SM 45 WA $52,328 $52,326 Prime Strategies Construct 2-lane divided roadway Fall 2004 $598,708 0598,709 Red Bud Lana(CR 122,Phase.1 5 2) From Oaths School Road to CR 123 PS&E Design cervices;Construct 54ane section, $277,383 $0 $277,383 Red Bud Lane(CR 122,Phase 3) From CR 123 to US 79 Bridge,Railroad crowing $3,375,809 $140,264 53,616,173 Construct railroad grade separation Fall 2005 $2,500,000 28,600,000 a 311,000,000 RM 920 at Union Pacific Railroad - SM 45 Round Rock East City Limits to Round Rock Wool Acquire ROW for SM 45 FV 2000 2215,200,000 a $272,570,871 - City Limits $31,378,911 $28,000,000 d (est) South may.Street,Dell Way 8 Goals School Realign streets,widen streets,extend streets August 2000 8 FY $4,980,000 - $21,485 a 24,901,405 •5100,000 South Mays Street Improvements Roos Extension 2001 Design and construct traffic signals 2000 $1,400,000 $1,400,000 Traffic Signals Various locations FM 132$/Louls Henna MCNeiLIH 35/RM 620 US Construct dna Implement coordinated traffic Summer 2003 $100,000 $100,000 TreOio Signal Coordination 76 - signal system° Reconstruct highway to 4 lane divided highway Completed $2,3763,500,000 a $9,176,882 •$174,108 US 79 From CR 195 to CR 110 ,892 $$300,000(001) a - Concoct 4lan a divkted Nghway Spring 2005 59,012,745 $3,000,000 a 512,012,745 51,000,000 US 79 From FM 14130 to CR 185 Construct 41ane divided roadway 'Summer 2006 ' $1,250,000 $1,250,00C° $1,250,000 Ter°vlata From 14.35 to Oakmonl Drive Miscellaneous programi�work in eapport of WA 5347,881 E341,Be1 Traneportetkn Consulting transportation miv'ry,t t/n R,..rel"*'2-YEAR'ECCMENT OTACv ,i v.t1'Ald ya ."),/,01,4:4124:985f493 1tr)).n7 7<200:724773"007w& n*1.4'w5416I6902e8, 21A30.035 E6.300.e69 LEGEND Page 1 of 1 a c State/Federal Fund Amendment 9(2 b•Private c-1997 CO Transportation Updated 6/24/05 d 0 Williamson County e-City Utility Fond . DATE: May 20, 2005 SUBJECT: Transportation System Development Corporation - May 24, 2005 ITEM: 6.A. Consider a resolution approving amendments to the Transportation Capital Improvement Plan (TCIP) to supplement funding to existing projects and to add new projects for roadway improvements, which would extend Oakmont Drive north of Chandler Road and extend Teravista Parkway east of IH 35 to the extension of Oakmont Drive as noted. The TCIP is being amended as follows: 1. To provide funding for construction of Oakmont Drive (Arterial "S") in the amount of $2,200,000. The project limits are from Teravista to Chandler Road. 2. To provide funding for construction of Teravista in the amount of $1,250,000. The project limits are from IH-35 to Oakmont Drive. 3. To supplement funding to existing projects. (To increase the budget for the IH 35 Area Improvements Project from $6,418,431 to $8,269,090. The additional $1,850,659 is for an increase in the construction estimate.)