4B-R-06-01 - 2/9/2006 RESOLUTION NO. 06-01
WHEREAS, the Round Rock Transportation System Development
Corporation ("RRTSDC" ) has previously adopted a Transportation Capital
Improvement Plan ( "Plan") , and
WHEREAS, the RRTSDC wishes to amend said Plan, Now Therefore
BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THE ROUND ROCK
TRANSPORTATION SYSTEM DEVELOPMENT CORPORATION,
That the amendment to the Transportation Capital Improvement Plan
for the Round Rock Transportation System Development Corporation,
attached hereto as Exhibit "A" , is hereby approved.
The Board of Directors hereby finds and declares that written
notice of the date, hour, place and subject of the meeting at which
this Resolution was adopted was posted and that such meeting was open
to the public as required by law at all times during which this
Resolution and the subject matter hereof were discussed, considered and
formally acted upon, all as required by the Open Meetings Act, Chapter
551, Texas Government Code, as amended.
RESOLVED this 9th day of February, 2006 .
ROUND RO K T' SPO'T•TI• . •STE
DEVELO.'M:. ► CO' ''�vj• �
By:
'L" • WE , P esident
ATTEST:
fl..s .0.170Secretary
@PFDesktop\::ODMA/WORLDOX/O:/WDOX/RESOLUTI/RRTSDC/0601.WPD/sC
2003 TRANSPORTATION CAPITAL IMPROVEMENTS PROGRAM
ROUND ROCK TRANSPORTATION SYSTEM DEVELOPMENT CORPORATION
Work Description Construction Data Estimated Trans. Other Funding Total Cost Prior Trans. Additional Trans.
Corp.Funding Corp Funding Corp Funding(this
Project Name Project Limits (Amend W2) Amendment)
Preliminary engineering to establish alignment WA $1,150,000 $1,150,000
Arterial A From US 79 to Forest Creek Drive and ROW requirements.Protective ROW
purchase
From Double Creek Drive to 800'West of Forest Completed $3,008,179 $1,294,526 b $4,378.319
Forest Creek Ridge Subdivision $77,614 8
Completed $2,850,000 $2,850,000
Double Creek Drive From Gattis School Rd to MKT ROW
Fall 2000 $21,856,294 $1,982,701 b $24,846,355 $793.940
AW Grimes Blvd(Arterial B) From US 79 to Louis Henna Blvd $1,007,360 e
Acquire ROW for Arterial C and construct Summer 2007 50 $0
Arterial C From RM 620 to Sem Bass Rd bicycle/sidewalk facility to access high school and
swimming pool
Design,purchase right-of-way end construct 4- Winter 2006 $11,188,906 $269,823 b $12,510,311
Kiphen Road(CR 113) From FM 1480 to CR 122 lane divided arterial $1,000,000 d
$51,582 e
Acquire ROW for highway relocation Completed $600,000 $8,200,000 a $8,800,000
FM 148D From US 79 to 1200'N of US 79
Construct 4lane divided arterial Completed $3,698,189 $88,533 b $4,331,861
Greenlawn Extension From Louis Henna Blvd to IH 35 Frontage Road $547,139 8
Construct Greenlawn Interchange with IH 35 Not Scheduled $0 $12,000,000 a $12,000,000
• Greenlawn Interchange At IH 35
Construct frontage road turnarounds Completed $3,533,562 $3,175,000 a $7,038,562
IH 35 Turnarounds FM 1325/Louis Henna/Hester's Crossing $328,000 c
Relocate ramps,widen frontage road,and Fall 200558,269,090 $4,042,768 a $12,311,856
IH 35 Area Improvements from Westinghouse Road to FM 1431 construct frontage road turnaround ii
IH 35 Frontage Rd C-0 and Raster's Crossing Construct Frontage road collector-distributor and Fall 2007 $9,780,000 $9,780,000
Bridge Replacement 35 5 Nester's Crossing replace Hesters Crossing Bridge
Abernethies to alleviate congestion WA $87,400 $87,400
Feasibility Study IH-35 8 RM 620 and IH 35 8 US 76
Construct 4-lane divided roadway Fall 2005 $2,200,000 $2,200,000 $2,200,000
Oakmont Drive(Arterial"5) From Teravista to Chandler Road •
Assist City In interagency coordination for SH 45 WA $52,326 $52,326
Prime Strategies
Construct 2-lane divided roadway Fall 2004 5596,708 5596,706
Red Bud Lane(CR 122,Phases 1 82). From Goths School Road to CR 123 •
PS8 E Design services;Construct 5-lane section, Spring 2008 $277,363 $0 $277,363
Red Bud Lane(CR 122,Phase 3) From CR 123 to US 79 Bridge,Railroad crossing $3,375,909 $140,264 $3,516,173
Construct railroad grade separation FY 2008 $2,500,000 $8,500,000 a 011,000,000
RM 620 at Union Pacific Railroad _
Round Rock East City Limits to Round Rock West Acquire ROW for SH 45 FY 2000 0215.200,000 a $272,578,911
SH 45 City Limits $31,378,911 528,000,000 d
• fest)
South Mays Street,Dell Way,Oaths School Road Realign streets,widen streets,extend streets August 2000 8 FY $4,880,000 521,465 a $4,901,465
South Mays Street Improvements Extension 8 DellwaylBoardwalk Connection 2001
Design and conehuct traffic signals On-going $1,400,000 $1,400,000
Traffic Signals Various locations
FM 1325/Louis Henna McNeil/1H 35/RM 620 US Construct and implement coordinated traffic Completed $100,000 $100,000
Traffic Signal Coordination 79 signal systems
Reconstruct highway to 4 lane divided highway Completed $2,375,882 03,500,000 a $8,175,892
US 79 From CR 195 to CR 110 $300,000(est)
d
Construct 4-lane divided highway Winter 2005 09,012,745 $3,000,000 a $12,012,745
US 79 From FM 1460 to CR 195
Construct4-lane divided roadway Fall 2005 $1,250,000 $1,250,000 $1,250,000
Teravista From IH-35 to Oakmont Drive
Miscellaneous consulting work In support of WA $341,981 9341,961
Transportation Consulting transportation program
3-YEAR ELEMENT TOTAL 8125,759.433 9290.724.773 I $416,454106 $3,45E000 793.840
LEGEND Am d of 1 EXHIBIT
a=State/Federal Fund Amendment#13
b=Private Updated 2/9106
0-1997 CO Transportation
d=Williamson County
e-City Utility Fund
•
.0 ttAtt
DATE: February 3, 2006
SUBJECT: Transportation System Development Corporation - February 9, 2006
ITEM: 6.A. Consider a resolution approving an amendment to the budget for the
Transportation Capital Improvement Plan (TCIP) to supplement funding for
the A.W. Grimes Boulevard Project.
The approval of this resolution will amend the Transportation Capital Improvement Program
(TCIP) as follows:
1. To provide additional funding for the Public Road Crossing Agreement with the
Union Pacific Railroad (UPRR) for the reconstruction of the railroad bridges, over
A.W. Grimes Boulevard Phase 2, in the amount of $774, 557.00. The project
limits for the roadway project are from Lake Creek to US 79 at FM 1460.
2. To reimburse UPRR for the cost of an independent review of the City's construction
plans for the bridge over the proposed A.W. Grimes Boulevard in the amount of
$19,383.00.
The total cost of the amendment is $793,940.00.