4B-R-06-02 - 3/23/2006 RESOLUTION NO. 06-02
WHEREAS, the Round Rock Transportation System Development
Corporation ("RRTSDC") has previously adopted a Transportation Capital
Improvement Plan ("Plan") , and
WHEREAS, the RRTSDC wishes to amend said Plan, Now Therefore
BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THE ROUND ROCK
TRANSPORTATION SYSTEM DEVELOPMENT CORPORATION,
That the amendment to the Transportation Capital Improvement Plan
for the Round Rock Transportation System Development Corporation,
attached hereto as Exhibit "A" , is hereby approved.
The Board of Directors hereby finds and declares that written
notice of the date, hour, place and subject of the meeting at which
this Resolution was adopted was posted and that such meeting was open
to the public as required by law at all times during which this
Resolution and the subject matter hereof were discussed, considered and
formally acted upon, all as required by the Open Meetings Act, Chapter
551, Texas Government Code, as amended.
RESOLVED this 23rd day of March, 2006 .
ROUND ROCK T' " SPORTAT • EM
DEVELOP
B y: ;.✓4///
r WELL President
ATTE T:
Af
, Secretary
@PFDeSktop\::ODMA/WORLDOX/O:/WDOX/RESOLUTI/RRTSDC/0602.WPD/SC
2003 TRANSPORTATION CAPITAL IMPROVEMENTS PROGRAM
ROUND ROCK TRANSPORTATION SYSTEM DEVELOPMENT CORPORATION
ii il f, .: S `� �: "� Rz. �.� a s,• 4. 7� t(�tnatod - � 'r10r•� tion sAd o
'�e Name a ;, 'iz
,. ,1 s�,; DucripMen F ?,..:4t •r'igl�tct1°.Pato 0041iag0 cottto'r u ng •Pur+ ng;.',e,; ,g a - r".'...,;,..-i.e..,,,, ,,. ',, .. s Amagdma sire�.��c �•.... .,�� �f.., � ��Amriiitlmart
Preliminary engineering to establish alignment N/A $1,650,000 51,850,000 $580,000
Arterial A From US 79 to Forest Creek Drive and ROW requirements.Protective ROW
purchase
From Doubts Creek Drive to 800'West of Forest l Completed $3,006,179 51,204,526 b $4,378,319 -
Forest Creek Ridge Subdivision $77,614 e
Completed $2,850,000 $2,850,000
Double Creek Drive From Gattis School Rd to MKT ROW
^J
AW Grimes Blvd(Arterial B) From US 7910 Louis Henna Blvd Fell 2000 524,056,294 51,982,701 h $27,048,355 $793,940 $2,200,000
$1,007,360 8
Acquire ROW for Arterial C and construct Summer 2007 50 $0
Arterial C From RM 620 to Sam Bass Rd bicycle/sidewalk facility to access high school
and swimming pool
Design,purchase right-of-way end construct 4- Winter 2006 511,188,908 5269,823 b 512,510,311
IOphen Road(CR 113) From FM 1460 to CR 122 • lane divided arterial $1,000,000 d
$51,582 8
Acquire ROW for highway relocation Completed $600,000 58,200,000 a $8,800,000
FM1460 From US 79 to 1200'N of US 79
•
Construct 4 lane divided arterial Completed . $88,533 b $4,331,861
Greenlawn Extension From Louis Henna Blvd to IH 35 Frontage Road 5547,139 e
Construct GreeNawn Interchange with IH 35 Not Scheduled $0 $12,000,000 a 512,000,000
Greerlawn Interchange At IH 35 u
Construct frontage road turnarounds Completed $3,533,582 $3,175,000 a $7,036,582
IH 35 Turnarounds FM 1325/Louis Henna/Hester's Crossing $328000 c
Relocate ramps,widen frontage road,and Fall 2005 $10,269,090 $4,042,766 a $14,311,856 $2,000,000
IH 35 Area Improvements from Westinghouse Road to FM 1431 construct frontage road turnaround
IH 35 Frontage Rd GD and HeslersCrosstng Construct Frontage road collector-distributor and Fall 2007 $9,780,000 $9,780,000
Bridge Replacement IH 35 @ Hester's Crossing replace Hester's Crossing Bridge
Alternatives to alleviate congestion N/A $87,400 $87,400
Feastlity Study IH-35 8 RM 620 and IH 35 8 US 79
Construct 4-lane divided roadway Fall 2005 52,200,000 $2,200,000
Oakmont Drive(Arterial'S') From Teravista to Chandler Road
Assist City In interagency coordination for SH 45 NW 352,326 $52,326
Prime Strategies
Construct 2-lane divided roadway Fall 2004 5598,706 5596,706
Red Bud Lane(CR 122,Phases 1&2) From Oaths School Road to CR 123
PS8 E Design services;Construct 5-lane Spring 2008 $277,363 $0 $277,383
Red Bud Lane(CR 122,Phase 3) From CR 123 to US 79 section;Bridge,Retread crossing $3,375,909 $140,284 $3,518,173
Construct railroad grade separation FY 2008 $2,500,000 $8,500,000 a $11,000,000
RM 820 at Union Pacific Rairoad
SH 45 Round Rock East City Limits to Round Rock West Acquire ROW for SH 45 2000 $31,378,811 5215,200,000$28,000,000 d $272,576,911
City Limits (est)
South Mays Street,Deg Way,Gattis School Road Realign streets,widen streets,extend streets August 2000 8 FY $4,880,000 $21,465 e $4,901,485
South Mays Street Improvements 2001
Extension 8 Dellway/Boardwalk Connection
Design and construct traffic signals On-going $2,230,000 $2,230,000 $830,000
Traffic Signals Various locations
FM 1325A-oils Henna McNeVIH 35/RM 620 US Construct and implement coordinated traffic Completed $100,000 $100,000
Traffic Signal Coordination 79 signal systems
Reconstruct highway to 4 lane divided highway Completed $2,375,892 $3,500,000 a $6,175,892
US 79 From CR 195 to CR 110 $300,000(est)
d
Construct 4-lane divided highway Winter 2005 $9,012,745 $3,000,000 a $12,012,745
US 79 From FM 1460 to CR 195
Construct 4-lane divided roadway Fall 2005 $1,250,000 $1,250,000
Teravista From IH-35 to Oakmont Drive
Miscellaneous consulting work In support of WA $341,961 $341,961
Transportation Consulting transportation program
aCYKR:44,,,,,,,,ivtv3,Y RE'Eh1ENTT1TAD . :. '',*,,P1MWAF,5131i289433agv-' :5290,724.775' i.."3",,,''.0$4Ya2�1dT2O6, $793,940 $5,530,000
EXHIBIT LEGEND Page 1 of t
a=State/Federal Fund Amendment#14
13 b=Private Updated 323/06
A c-1997 CO Transportation
a d=Williamson County
',Alt e-City Wily Fund
DATE: March 17, 2006
SUBJECT: Transportation System Development Corporation - March 23, 2006
ITEM: 7.A. Consider a resolution approving amendments to the Transportation
Capital Improvement Program (TCIP) to adjust funding for existing
projects.
This resolution will approve the following amendments to the TCIP.
The TCIP is being amended for the following:
1. To provide additional funding for Arterial "A" in the amount of $500,000. The funds
are required for engineering service to design the US 79 and Union Pacific Railroad
underpasses and miscellaneous roadway design. The project limits are Joe DiMaggio
Boulevard to the Union Pacific Railroad.
2. To provide additional funding for A.W. Grimes Boulevard Phase 2 in the amount of
$2,200,000. The funds are required for engineering services, surveying, construction
inspection, relocation of water, wastewater, drainage and dry utilities, demolition of
existing structure, street lighting, drainage and construction contingency. The
project limits are Lake Creek to US 79 at FM 1460.
3. To provide additional funding for IH 35 Area Modifications in the amount of
$2,000,000. The funds are required for additional engineering, Construction phase
services, relocation of water and dry utilities, financial services, legal fees,
construction of turn lanes for IKEA and entrance for McNeil Park and construction
contingency. The project limits are Westinghouse Road to University Boulevard.
4. To provide additional funding for Traffic Signals in the amount of $830,000. The
funds are required for design and construction of traffic signals at FM 3406 and
Wyoming Springs Drive, FM 3406 and Creek Bend Boulevard, FM 3406 and Chisholm
Trail Road, Gattis School Road and Surrey Drive, Gattis School Road and South
Creek Drive, Gattis School Road and Via Sonoma Trail and University Boulevard and
Sunrise Road.