Loading...
4B-R-07-05 - 11/8/2007 RESOLUTION NO. 07-05 WHEREAS, the Round Rock Transportation System Development Corporation ("RRTSDC") has previously adopted a Transportation Capital Improvement Plan ("Plan") , and • WHEREAS, the RRTSDC wishes to amend said Plan, Now Therefore BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THE ROUND ROCK TRANSPORTATION SYSTEM DEVELOPMENT CORPORATION, That the amendment to the Transportation Capital Improvement Plan for the Round Rock Transportation System Development Corporation, attached hereto as Exhibit "A" , is hereby approved. The Board of Directors hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 8th day of November, 2007 . ROUND ROCK TRANSPORTATION S- - M DEVELOPMENT •RP• " c j By: , jori • WEL , President ATTEST: / Ai / jaA040s..v '0 , Secretary O:\wdox\RESOLUTI\rrtsdc\0705.WPD/rmc TRANSPORTATION CAPITAL IMPROVEMENTS PROGRAM ROUND ROCK TRANSPORTATION SYSTEM DEVELOPMENT CORPORATION Construction Estimated Prior Corporation Additional Corporation Project Name Project Limits Work Description Date Corporation Other Funding Total Cost Funding Amendment Funding This Funding #19 Amendment — Arterial A From US 79 to Forest Creek Drive Preliminary engineering to establish alignment and ROW N/A $1,650,000 $1,650,000 reouirements.Protective ROW purchase Design,purchase right-of-way and construct 4-lane divided arterial Fall 2008 $3,550,000 $3,550,000 $3,550,000 Arterial M From Old Settlers Boulevard to Jeffrey Way From Double Creek Drive to 800'West of Forest Ridge Completed $2,745,647 $1,326,513 b $4,131,221 -$59,698 Forest Creek Subdivision $59,061 e Double Creek Drive From Gattis School Rd to MKT ROW Completed $2,731,852 $2,850,000 Fall 2000 $24,572,768 $1,982,701 b $28,018,685 $130,363 AW Grimes Blvd(Arterial B) From US 79 to Louis Henna Blvd $149,999 c $1,313,217 e Arterial C From RM 620 to Sam Bass Rd Acquire ROW for Arterial C and construct bicycle/sidewalk facility to N/A $0 $0 access high school and swimming cool Design,purchase right-of-way and construct 4-lane divided arterial - Winter 2006 $12,898,314 $1,135,895 b $15,246,561 $787,616 $411,792 Kiphen Road(CR 113) From FM 1460 to CR 122 $1,000,000 d $212,352 e Acquire ROW for highway relocation and relocate City utilities Fall 2007 $1,062,384 $8,200,000 a $9,262,384 -$37,616 FM 1460 From US 79 to 1200'N of US 79 Construct 4 lane divided arterial Completed $3,633,868 $86,533 b $4,267,540 -$18,203 Greenlawn Extension From Louis Henna Blvd to IN 35 Frontage Road $547,139 e ' Construct Greenlawn Interchange with IH 35 Not Scheduled $0 $12,000,000 a $12,000,000 Greenlawn Interchange At IN 35 Construct frontage road tumarounds Completed $3,533,562 $3,175,000 a $7,036,562 IN 35 Turnarounds FM 1325/Louis Henna/Hester's Crossing $328,000 c Relocate ramps,widen frontage road,and construct frontage road Fall 2005 $10,269,090 $4,042,766 a $14,311,856 III 35 Area Improvements from Westinghouse Road to FM 1431 turnaround IN 35 Frontage Rd C-D and Hester's CrossingConstruct Frontage road collector-distributor and replace Hester's Spring 2007 $17,880,000 $17,880,000 IH 35®Hester's Crossing Crossing Bridge Bridge Replacement Alternatives to alleviate congestion N/A $92,203 $87,400 Feasibility Study IH-35&RM 620 and IH 35&US 79 Construct 4-lane divided roadway Fall 2005 $2,235,610 $2,235,610 Oakmont Drive(Arterial"S'') From Teravista to Chandler Road Assist City in interagency coordination for SH 45 Completed $52,326 $52,326 Prime Strategies Red Bud Lane(CR 122,Phases 1&2) From Gattis School Road to CR 123 Construct 2-lane divided roadway Fall 2004 $1,162,071 $1,162,071 -$33,891 Red Bud Lane(CR 122,Phase 3) From CR 123 to US 79 PS&E Design services:Construct 5-lane section,Bridge,Railroad Fall 2006 $617,363 $0 $617,363 -$300,000 crossing $3,075,909 $140,264 $3,216,173 Construct railroad grade separation FY 2008 $2,500,000 $8,500,000 a $11,000,000 RM 620 At Union Pacific Railroad Acquire ROW for SH 45 FY 2000 $27,435,322 $215,200,000 a $268,635,322 -$3,941,589 SH 45 Round Rock East City Limits to Round Rock West City Limits $26,000,000 d (es t) South Mays Street,Dell Way,Gattis School Road Extension&Realign streets,widen streets,extend streets Completed $4,720,270 $21,465 e $4,741,735 -$49,363 South Mays Street Improvements Dellway/Boardwalk Connection Design and construct traffic signals On-going $2,230,000 $2,230,000 Traffic Signals Various locations Construct and implement coordinated traffic signal systems Completed $99,597 $99,597 Traffic Signal Coordination FM 1325/Louis Henna McNeil/IN 35/RM 620 US 79 Reconstruct highway to 4 lane divided highway Completed $2,285,892 $3,500,000 a $6,085,892 US 79 From CR 195 to CR 110 $300,000(es t) d US 79 From FM 1460 to CR 195 Construct 4-lane divided highway Winter 2005 $9,562,745 $3,000,000 a $12,562,745 $550,000 Construct 4-lane divided roadway Fall 2005 $1,250,000 $1,250,000 Teravista From 111-35 to Oakmont Drive Miscellaneous consulting work in support of transportation programs On-going $656,351 $656,351 Transportation Consulting and planning Construct half of a 4-lane divided roadway Spring 2007 $2,000,000 $2,000,000 Arterial T From University Blvd to CR 112 Construct half of a 4-lane divided roadway Fall 2009 $3,400,000 $3,000,000 d $6,400,000 $3,400,000 Wyoming Springs Drive From RM 620 to Brightwater Boulevard TOTAL 0147,903,144 9292,220,905 $443,237,394 $831,000 53,558,411 LEGEND Page 1 of 1 a=State/Federal Fund Amendment#20 e� b=Private Updated 11/08/07 i rh ,&„ J 4^r', rl 0 6 . Y1 c-GO&CO Transportation i d=Williamson County ,4i.' e-City Utility Fund rag guui DATE: November 1, 2007 SUBJECT: Transportation System Development Corporation - November 8, 2007 ITEM: 7A. Consider a resolution approving an amendment to the Transportation Capital Improvement Program (TCIP) to adjust funding for existing and proposed projects. The TCIP is a multi-year spending plan for improvements to major roads and arterials in the City. Funding for this plan is provided through the '/2 cent sales tax established for the purpose of transportation system improvements that support economic development. Public testimony is required prior to considering the following amendments to the TCIP: 1. Provide funding for Arterial M (Mays/Oakmont) extension in the amount of $3.55 million. The funds are required to fully fund design, right-of-way acquisition, utility relocation, and construction. The project limits are Old Settlers Boulevard to Jeffrey Way. 2. Provide funding for Wyoming Springs improvements in the amount of $3.4 million. At the request of the City, Williamson County allocated $3.0 million of their 2006 Road and Parks Bond Issue for the construction of Wyoming Springs between RM 620 and Brightwater Boulevard. This project will construct the remaining two lanes of the proposed MAD 4 and includes paving, curb, gutter, drainage and other associated appurtenances. This project will include a pedestrian crossing facility for students attending Fern Bluff Elementary School. The project limits are RM 620 to Brightwater Boulevard. 3. Provide funding for the US 79 Gap project in the amount of $550,000.00. These funds will be used for right-of-way acquisition. 4. Provide additional funding for the Old Settlers Boulevard (Kiphen Road) Project in the amount of $411,792 for right-of-way expenses. The project limits are FM 1460 to Red Bud Lane (CR 122). 5. Reduce funding for SH 45 by $3,941,589.00 for project close out. 6. Reduce funding for Red Bud Lane (CR 122 Phase 3) by $300,000 for project close out. 7. Reduce funding for the Forest Creek Project by $59,698.00 for project close out. 8. Reduce funding for the Greenlawn project by $18,203.00 for project close out. - 9. Reduce funding for Red Bud Lane (CR 122 Phase 1 & 2) by $33,891.00 for project close out.