Loading...
R-11-02 - 3/10/2011 RESOLUTION NO. 11-02 WHEREAS, the Round Rock Transportation System Development Corporation ("RRTSDC") has previously adopted a Transportation Capital Improvement Plan("Plan"), and WHEREAS,the RRTSDC wishes to amend said Plan,Now Therefore BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THE ROUND ROCK TRANSPORTATION SYSTEM DEVELOPMENT CORPORATION, That the amendment to the Transportation Capital Improvement Plan for the Round Rock Transportation System Development Corporation, attached hereto as Exhibit "A", is hereby approved. The Board of Directors hereby finds and declares that written notice of the date, hour,place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 10th day of March, 2011. ROUND ROCK TRANSPORTATION SYSTEM DEVELOPMENT CORPORATION B 4 Y• 0 Pet ALAN MCGRAW, President ATTEST: `-•- , Secretary O:\wdox\S CC Ints\0112\1104\MUNICIPAL\00215740.D OC/rmc • TRANSPORTATION CAPITAL IMPROVEMENTS PROGRAM ROUND ROCK TRANSPORTATION SYSTEM DEVELOPMENT CORPORATION °ry "ESNtnaletl<`, Prior Coryareflon Addidonal o _ �, p eName, .* . r� ,�. i Project Limits -. .; :.�. `� ,Work'Description.' ,. Construction Dale = 0111er Pending s ..Tel Cost ip FundingNnendment Corporation Funding Co di` rodct � r, tporetion Fun og g ,;4".,'1126 Thi,Amehdmerrt A26 Preliminary engineering to establish+alignment Summer 2011 $21,818,000 $21,818,000 Kenney Fort Boulevard(Arterial A) From Joe DiMaggio Boulevard to 1000 feet south of and ROW requirements.P.S.&E.Construction of US 79 Railroad overpass.Protective ROW purchase From Old Settlers Boulevard to approximately Design,purchase right-of-way and construct 4- Winter 2010 $3,550,000 $3,550,000 North Mays Extension Jeff erey Way lane divided arterial Design,purchase right-of-way and construct 4- Winter 2006 512.898,314 $1,135,895 b $14,034,209 Old Settler's Blvd./Kiphen Road(CR 113) From FM 1460 to CR 122 lane divided arterial $1,000,000 d $1,000,000 $212,352 a $212,352 Acquire ROW for highway relocation and relocate Fall 2008 $5,997,449 $8,200,000 a $14,197,449 -$2,564,935 FM 1460/AW Grimes 900'North of US79 to Old Settler's Blvd. City utilities.Preliminary engineering and final P.S.&E.Construction of MAD 4. Construct railroad grade separation FY2013 $2,500,000 $8,500,000 a $11,000,000 RM 620 At Union Pacific Railroad Design and construct traffic signals On-going $5,150,000 $5,150,000 $500,000 Traffic Signals Various locations Miscellaneous consulting work in support of On-going $906,351 $906,351 Transportation Consulting transportation programs and planning • Construct half of a 4-lane divided roadway Spring 2009 $4,057,552 $1,553,565 d $5,611,117 -$959,000 Wyoming Springs Drive From RM 620 to Brightwater Boulevard Design and construct MAD 4 Fall 2009 $1,427,000 $1,427,000 -$1,323,000 Red Bud Lane Phase 4 From CR 123 to Woodland Loop Design Intersection improvements Including turns Spring 2012 $562,628 $562,628 $27,628 South Mays at Gattis School Road 1000 feet in all directions of intersection lanes,signal improvements and pedestrian accomodations Design MAD 4 Spring 2012 $910,000 $910,000 FM 3406 Chisholm Trail to Creekbend Boulevard Design Ota extension viMain Street owl.lake('reek to TBD $1,200,000 $1,200,000 $1,200,000 Main Street Project 1 Main Street extension,IH 35 to San Saba the 81-75 t'nmtngc road;includes the purchase vi' ry richt't=u•av Main Street,San Saba to Blair Street with storm Design and construct Main Street to match ns Spring 2010 $4,410,000 $4,410,000 $4.410,000 Main Street Project 2,3 and 7 a,nslmcliun in SWDI'.Includes storm setrer on lllair sewer on Blair Street Slrcel Ittmt Main$Inset n+Flnrence Slrtal Design the realignment of RR Avenue onto Libeny TBD $964,000 $964,000 $639,000 • Main Street,Blair to Mays Street and Liberty Avenue;includes the design of a signal at the Round Rock Avenue/Liberty Avenue realignment Avenue,from Round Rock Avenue to Mays Street. Liberry/Mays intersection and the design of Main Street between Blair and Mays Streets Spring 2012 $3,300,000 $3,300,000 $3,300,000 Chisholm Trail 3 1900 feet north of Wolle Lane to Wolle Lane lkign;md construct Chisholm trail Road as a MAD 4. and build a public road to Special Event('enter Property Ongoing $1,500,000 $1,500,000 $1,500,000 2011 Major Maintenance Program Various locations Major maimcnancc nl'carious apodals throughoutthe City Summer 2013 513,567 $452,270 $465,837 $13,567 Railroad Quiet Zones UPRR,between CR 172 and St.Williams ('recta a w,ilnmd Quin l me Mlo ova CR IT_and St. \Villianrs Sinxt Total Current Projects $71,164,861 $21,054,082 $0 $92,218,943 $6,249,000 $494,260 (see page 3)Total Completed Projects $115,330,649 $261,172,658 $376,503,306 $0 -$8,047,821 -'77''''7 ,—' "''' . . r5 ., Total TCIP ProleCts ,/ $186 465,10 $262 226,740 $466 722,260• - 1'241I,6.66 $765--,.! , EXHIBIT 1 TRANSPORTATION CAITALIMPROVEMENTS PROGRAM R0uNDRODKTRANRRRTAN:NSYSTEDEyELOmENCORPO CORPORATIONE ::',':f..'':t`:::'.;:".',:::,!;'1.;;,:'",?...:t..,'''...',':''. , •,,i.;: .::.:i,,,,.',:;.-.::.s.f,,,"-::,-,--,:,:,1'.',:,::",;iii..-.::'ViT,':'''';';-,-;:,',L''.-:-‘ ,.':-,•.1.' ,''''''''"''.!:'.'•:''''ia:;g:::::,,',',A,X.:::4:: iiii,;'..'t.':-,I ,..1',. ., ...:,:•:. ,'--, ,:e. .; i'4,...',Arii;;ijoi;C,:T74.aciiiiiii:::::, !',...i.?1,)Name : ,:3,'-, ;,; <:A.:::;:gt.,','Pi.,:c#0cplit .J,,,,,ZAT.,,:•-Z5 '..‘i.,:',. ! I,.-:.,(Ii.pe,0cAp,09„IP,:1,.y;.,..,,x 's:9*p'1510iip,mci., --, -rposstlOeding1other Funding ,.,..,•.§„1-,,,?4,1p;itiA-:,Funding,mleroiOns Corporation Funding ',:',..,iiz.ws.6.!''.',-.' T-'::,, ,,;r't ,I,,a'r.,<''i.•,.,'',-,:`,:'','''Y,,,'.,,,,,..' 1)i,,,NQ:,:-.,-.',,A,,,,'.., c:7,,,,,,,.•,',2A.'',<•-,,Y,,,n',:.-.c,,,,,T;AN,,,..°0,-,,,,,,,,'. ,4N',zm,,,,0:.,-,:,,,,,-,,,,,,.:,'i,.,,,,,:,,,,:!,,,,-6.!--,,,,:.••,,,-,:ei, 0,:,,,:'.,,,.,.7.,•.',',.;,..,Fi.-.A ..; qu.:,,,i'b;P,w,,,-,',.",,,c-,v.:,,t,,,,,,.;,:i'...,,,:',.'.': .,:.1,-1, 70.!".!!!!!!6, COMPLETED PROJECTS Completed $2,805,712 $1.326,513 b $4,132,225 From Double Creek Drive to 800'West of Forest Forest Creek Ridge Subdivision $59,061 e $59,061 Completed $$12$852 $$12$852 Double Creek Drive From Gattis School Rd to MKT ROW Completed $24,099.768 $1,982,701 b $26,082,469 -$473,000 AW Grimes Blvd(Arterial B) From US 79 to Louis Henna Blvd $149.999 c $149.999 $1,313,217 e $1,313,217 Construct 4 lane divided arterial Completed $3.633,868 $86,533 b $3,720,401 Greenlawn Extension From Louis Henna Blvd to IH 35 Frontage Road 5547.139 e $547,139 Construct frontage road turnarounds Completed $3,533,562 $3,175,000 a $6,708,562 IH 35 Turnarounds FM 1325/Louis Henna/Hester's Crossing $328,000 c $328,000 Alternatives to alleviate congestion N/A $92,203 $92,203 Feasibility Study IH-35&RM 620 and hi 35 8 US 79 Construct 4-lane divided roadway Completed $1,660,169 $1,660,169 Oakmont Drive(Arterial°S") From Teravista to Chandler Road Construct 4-lane divided roadway Completed $1,249,590 $1,249,590 Teravista From IH-35 to Oakmont Drive Construct hall of a 4-lane divided roadway Spring 2007 $1,191,392 01.191,392 Arterial T From University Blvd to CR 112 Assist City in interagency coordination for SH 45 Completed $52,326 $52,326 Prime Strategies Construct 2-lane divided roadway Completed $1,162,071 $1,162,071 Red Bud Lane(CR 122,Phases 1 62> From Gattis School Road to CR 123 PS&E Design services;Construct 5-lane section, Completed $617,363 $0 $617,363 Red Bud Lane(CR 122,Phase 3) From CR 123 to US 79 Bridge,Railroad crossing $2,591,178 $140,264 $2,731,442 Mt IRealign streets,widen streets,extend streets Completed - $4,720,270 $21,465 e $4,741,735 mprovements South Mays Street,Dell Way,Gals School Road South ays Stree Extension&Dellway/Boardwalk Connection Construct and implement coordinated traffic signal Completed $98,888 $98,888 -$709 Traffic Signal Coordination FM 1325/Louis Henna McNeiVIN 35/RM 620 US 79 systems Reconstruct highway to 4 lane divided highway Completed $2,285,892 $3,500,000 a $5,785,892 U579 From CR 195 to CR 110 $300,000 (est) $300,000 Acquire ROW tel SH 45 Completed $27,435,322 $215,200,000 a $242,635,322 H Round Rock East City Limits to Round Rock West S45 City Limits $26,000,000 d $26,000,000 (est) Construct 4-lane divided highway Completed $8,654,887 $3,000,000 a $11,654,887 -$1,007,858 US 79 From FM 1460 to CR 195 Relocate ramps,widen frontage road,and Completed $9,563,980 $4,042,766 a $13,606,746 -$705,110 IH 35 Area Improvements from Westinghouse Road to FM 1431 construct frontage road turnaround d Hester' IH 35 FtRd CDCiConstruct Frontage road collector-distributor and Completed $16,171,294 $16,171,294 -$1,708,706 Bridge Replacement ronage ans rossng IH 35 0 Hester's Crossing replace Hester's Crossing Bridge Design intersection improvements including dual Completed $88,856 $88,856 -$31,144 US 79 at North Mays 1000 feet in all directions of intersection left turns for all approaches,signal improvements - and pedestrian accomodations Design MAD 4 Reprioritized $0 $0 -$711,000 Arterial M(M-5) University Boulevard to Chandler Creek tributary D Chandler Creek tributary to Cypress Cove(includesesign MAD 4 Reprioritized 52.500 $2,500 -$770,000 Arterial M(M.4) bridge) Design MAD 4 Reprioritized $0 $0 -$776,000 Arterial L-2 From Arterial M to the north IH-35 frontage road Design MAD 4 Reprioritized $9,706 $9,706 -$1,279,294 Arterial M(M-3) Cypress Cove extension to Paloma Design MAD 4 Reprioritized $0 $0 -$235,000 Cypress Cove Extension Cypress Boulevard to Arterial M Design MAD 4 Reprioritized $0 $0 -$350,000 AW Grimes Boulevard From Louis Henna to the southern ETJ Conduct preliminary engineering,develop right of Completed $486,000 $486,000 Arterial C From RM 620 to Sam Bass Rd way map and acquire ROW for Arterial Cat the intersection of RM 620 and Deepwood Drive '.:A0141:99P1P100rrdi"lS'.''' ' 7'''''''-'':-;e:; pi ...?g1,64p,:i t4.:',,,$2614458;'sr" , . 7,94496,,,,:gpi:.,,.50:4,<Asp;.,..;-?,,,,,,,A94702i LEGEND a=State/Federal Fund Amendment 826 b=Private Updated 03-10-11 2 c-GO&CO Transportation d=Williamson County • e-City Utility Fund