CM-2017-1391 - 5/19/2017Page I of 3 pp— Contract Quantity Adjustment/ Change Order rOUNDMOr rev. 01/16 Department: Utilities and Environmental Services Project Name: Hester's Crossing Channel Improvements Date: 5/15/17 City Project Change Order/Quantity ID Number Adjustment No. 2 Vendor Myers Concrete Construction, L.P. P.O. Box 2928, Wimberley, TX 78676 (512) 847-8000 Company Name Address Phone No. Justification Additional excavation and stabalized fill required to create a suitable base for gablon baskets SUMMARY Original Contract Price: Previous Quantity Adjustment(s): This Quantity Adjustment: Total Quantity Adjustment(s): Total Contract Price with Quantity Adjustment(s): Previous Change Order(s): This Change Order: Total Change Order(s) To Date: Adjusted Contract Price (Original Contract Price Plus Quantity Adjustment(s) Plus Change Order(s)): Difference between Original and Adjusted Contract Prices: Original Contract Time: Time Adjustment by previous Quan. Adj./Change Order: Time Adjustment by this Quan. Adj./Change Order: New Contract rime: City Proje Manager: r 5chitsEg<r'�►j#�?axaT Printed Nar6e, Title, Company i' L � Printed Name, Tie, Company N Amount % Chanae Date All -2-0/-7-/ -3 7/ $3,253.61 3% $12,485.25 11% $15,738.86 14/4 $124,789.66 $15,738.86 90 32 7 129 CU zzSr Lt -{ Date Date All -2-0/-7-/ -3 7/ w. au a6 Contract Quantity Adjustment/Change Order MOM Project Name. nester's Crossing Channel Improvements Quan. Adj./Change Order No.: Change Order Data Page 2 of 3 Item # Item Description Unit Qty. Unit Price Amount Contract Time Adjustment Adjusus kT 14 Excavation CY 46.5 $85.00 $3,952.50 3 14 - 3" x 5" Fill Material CY 46.5 $183.50 $8,532.75 4 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 _ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 - $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 �- TA $11,485.251 __7 Page 3 of 3 Contract Quantity Adjustment/Change Order Project Name: Hester's Crossing Channel Improvements Quan. Adj./Change Order No.: ^quantity Austment Data Contract Time Bid Item # Item Description Unit Qty. Unit Price Amount Adjustment� $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 - $0.00 $0.00 $0.00 $0.00 $0.00 '` , A 0.00 0 Channel Excavation LABOR Number Hourly W/ Overburden 8 Hour day 3 days Foremen 1 $ 20.00 $ 28.00 $ 224.00 $ 672.00 Operator 1 $ 16.00 $ 22.40 $ 179.20 $ 537.60 Skilled Labor 1 $ 14.00 $ 19.60 $ 156.80 $ 470.40 Labor 1 $ 12.00 $ 16.80 $ 134.40 $ 403.20 Total $ 62.00 $ 86.80 $ 694.40 $ 2,083.20 EQUIPMENT Backhoe Daily Bobcat/Mini Daily Total Daily 3 days $275 $275 $230 $230 $505 $1,515 MATERIAL HAULING Cubic Yardage Tandem Loads Cost Per Load Total Cost 46.5 $ 7 $ 125.00 $ 875.00 TOTAL e05T $ 4,4473.2% Installation of 3" x 5" Riprap LABOR Number Hourly W/ Overburden 8 Hour day 4 days Foremen 1 $ 20.00 $ 28.00 $ 224.00 $ 896.00 Operator 1 $ 16.00 $ 22.40 $ 179.20 $ 716.80 Skilled Labor 1 $ 14.00 $ 19.60 $ 156.80 $ 627.20 Labor 1 $ 12.00 $ 16.80 $ 1.34.40 $ 537.60 Total $ 62.00 $ 86.80 $ 694.40 $ 2,777.60 EQUIPMENT Backhoe Daily Bobcat Daily/M Total Daily 4 days $275 $230 $505 $2,020 MATERIAL Tonnage Price Per Ton Total Cost 61 $ 15.90 $ 969.90 HAULING Tonnage Trailer Loads Cost Per Load Total Cost 61 3 $ 225.00 $ 675.00 "TOTAL WIT $ 61442.5x` Combined Total Cost $ 10,915.70 Overhead @ 10% $ 1,091.57 Total Cost With Overhead $ 12,007.27 Profit @ 5°Y $ 12,487.56 City of Round Rock ROUND ROCK TEXAS Agenda Item Summary Agenda Number: Title: Consider executing Quantity AdjustmenttChange Order No. 2 with Myers Concrete Construction, LP for the Hesters Crossing Channel Improvements Project. Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 5/19/2017 Dept Director: Michael Thane, Director of Utilities and Environmental Services Cost: $12,485.25 Indexes: 2014 Drainage Revenue Bonds Attachments: QA -CO No. 2_HestersCrossingChannelImprovements _5.16.17.pdf, LAF_QA-CO No.2_HestersCrossingChannellmprovements_5.16.17.pdf Department: Utilities and Environmental Services Text of Legislative File CM -2017-1391 The Hester's Crossing Channel Improvements project includes the construction of two rock gabion walls with mortared rock rip rap in between both walls. The site is located downstream of La Frontera Village dam which is north of Hester's Crossing Road. During excavation of the site, the contractor had issues with constant ground water coming from underneath the existing road culverts and below the ground. After excavating to the proposed gabion walls foundation base, the contractor did not find stable material at this elevation. The engineer of record was informed via a Request for Information and asked to provide a recommendation for an alternative foundation design. After analyzing the site, it was determined that each of the foundations would need to be over excavated to a depth where stable material was found. The contractor was instructed to over excavate the site, backfill and install a rock foundation as the base for each of the gabion walls. Change Order No. 2 include the cost of labor, additional materials and equipment for the work performed. Total cost is $12,485.25 Cost. $12,485.25 Source of Funds: 2014 Drainage Revenue Bonds City of Round Rock Page i Printed on 5/18/2077