Loading...
R-01-08-09-13E1 - 8/9/2001 RESOLUTION NO. R-01-08-09-13E1 WHEREAS, the City of Round Rock has previously entered into an agreement for engineering services ( "Agreement" ) with Baker-Aicklen & Associates, Inc . for the reconstruction of Chisholm Trail from Chisholm Trail Hotel Centre to Wolle Lane, and WHEREAS, Baker-Aicklen & Associates, Inc . has submitted an Additional Services Authorization for the survey and design of an off- site 12-inch waterline along Chisholm Trail, and WHEREAS, the City Council desires to enter into said Additional Services Authorization with Baker-Aicklen & Associates, Inc. , Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City an Additional Services Authorization for the survey and design of an off-site 12-inch waterline along Chisholm Trail . The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended, and the Act . RESOLVED this 9th day of August, 2001 . C1, -A&.z, RC&PfZT A. STLUKA, R. , Mayor A�ST: City of Round Rock, Texas 11A AA A I 04 tir J6PNNE LAND, City Secretary ::ODMA\WORLDOX\0:\WDOX\RESOLUTI\00008641.WPD/sc h, Baker-Aicklen & Associates, Inc. Date 7/13/01 Engineers/Surveyors Proposal No.01-5074 ADDITIONAL SERVICES AUTHORIZATION Client Project No. CITY OF ROUND ROCK 601-559 Project Contract Date Proposed Improvements to Chisholm Trail 1/12/99 Subject of Additional Services Additional Services Project No. Off-Site 12-inch water line 601-559-27,28,29 1. On the ground 30-foot wide, design survey, of edge of pavement, fences, power poles, 1-foot contours and property corners. $2,000. 2. Prepare field notes and sketch of two 15' PUE's. $1,500. 3. Prepare construction drawings for 1300 L.F. of 12-inch water line and add to existing Chisholm Trail improvements $3,500. Reason For Change City Requested Compensation: Hourly charge plus reimbursable expense basis, as defined in the PROFESSIONAL SERVICES AGREEMENT, and in addition to the compensation for BASIC SERVICES. Total charges for these ADDITIONAL SERVICES are estimated to be approximately$_ X Lump sum charge basis plus reimbursable expenses, as defined in the PROFESSIONAL SERVICES AGREEMENT, and in addition to the compensation for BASIC SERVICES. Total charges for these ADDITIONAL SERVICES are to be $7,000.00 Estimated Date of Completion: A S A P PREPARED BY: H. D. Rove,P. E. PROPOSED BY: BAKER- ICKLEN&ASSOCIATES,INC. J .Willi m Wtz, P. Date APPROVED BY: 8 -9-01 Che Date Titles (Sign,keep Client's copy&return all others. STANDARD RATE SCHEDULE (Labor Rate Table 35) Effective March 1, 2000, the following rates are recommended for work performed on an hourly-charge basis. Rates include company overhead and profit for services accomplished during regular working hours. DIRECT LABOR OFFICE PERSONNEL SERVICES Classification Rates Project Engineer/Surveyor/Planner........................................................................................ $110.00 per hour Staff Engineer/Surveyor/Planner................................................................................................$95.00 per hour Project Designer/Coordinator ................................................................................................... $85.00 per hour Engineering Assistant/Surveying Assistant/GPS Processor .................................................... $65.00 per hour Senior Engineering/Surveying CAD Technician ..................................................................... $60.00 per hour Engineering/Surveying CAD Technician/Field Representative ............................................... $55.00 per hour CADDraftsman ........................................................................................................................ $45.00 per hour Secretary ................................................................................................................................... $45.00 per hour Expert Witness/Testimony/Deposition Services ................................................................... Two Times Rates Principal (as appropriate) ....................................................................................................... $120.00 per hour FIELD PARTY SERVICES Rates 1-Man Field Party ..................................................................................................................... $70.00 per hour 2-Man Field Party ..................................................................................................................... $95.00 per hour 3-Man Field Party ................................................................................................................... $120.00 per hour 4-Man Field Party ................................................................................................................... $145.00 per hour GPS Field Unit with Operator(Note 5) .................................................................................. $100.00 per hour GPS Field Unit without Operator(Note 5) ............................................................................... $60.00 per hour DIRECT EXPENSES Transportation: By Firm's Passenger Vehicles (Note 1) ................................................................................ $ 0.35 per mile By Firm's Survey Trucks (Notes 1, 2, 3 &4) ....................................................................... $ 0.35 per mile Subsistence of out-of-city work................................................................................................ $100.00 per day Reproduction&Printing by Firm. .......................................................................................... Prevailing Com- Survey Stakes, Lathes, Iron Rods ....................................................................................... mercial Rates Or and other Direct Expense..................................................................................................... Cost, Plus 10% Notes: 1. A mileage charge will be billed for projects exceeding a 50-mile radius of the base office only. 2. Field Party rates include conventional equipment, supplies and survey vehicles. Abnormal use of stakes, lathes, etc., used such as during the construction phase of a project will be charged as indicated. 3. A minimum of two (2) hours field party time charge will be made for show-up time and return to office, resulting from inclement weather conditions, etc. 4. Field Party stand-by time will be charged for at the above-shown appropriate rates. 5. Rates apply to actual time GPS units are in use. All other time will be charged as appropriate normal field party rates. 6. The firm's professional liability is limited to the total amount of compensation associated with a specific project up to a maximum of$50,000. ]Baker-Aicklen (�� & Associates, Inc. Engineers/Surveyors i rayl 1, " J " e4, " 1 � 1 L 1 " r I " � iii , I. i '1�\ __ \ \ •.\ N ¢a��nd �r�cf E Chisholm Trail Street Improvements lipk 1'u' CI$ S DATE: August 6, 2001 SUBJECT: City Council Meeting—August 9, 2001 ITEM: 13.E.1. Consider a resolution authorizing the Mayor to execute an Additional Services Authorization with Baker Aicklen & Associates, Inc. for the reconstruction of Chisholm Trail from Chisholm Trail Hotel Centre to Wolle Lane. This supplement is for additional Engineering services for the survey and design of an off- site 12-inch waterline along Chisholm Trail. These additional services will increase the contract amount to $101,850.00. Resource: Jim Nuse, Public Works Director Bill Stablein, Traffic Engineering Assistant History: On the 27th of April, 2000 the City Council approved Resolution R-00-04-27- 12132 to retain design and survey services for Chisholm Trail reconstruction with Baker-Aicklen &Associates, Inc. Funding: Cost: $7,000 Source of funds: Self-Financed Utility Construction Fund(Fund 220) Outside Resources: Baker-Aicklen&Assoc., Inc. Impact: This waterline will supply a secondary source of water to major business along the I-35 Frontage Road and Chisholm Trail. Benefit: The benefit of installing this waterline will not only add a secondary water source increasing the dependability of the water supply system, but will also facilitate the reconstruction of Chisholm Trail roadway. Public Comment: N/A Sponsor: N/A