R-07-10-25-11E1 - 10/25/2007 RESOLUTION NO. R-07-10-25-11E1 WHEREAS, the City of Round Rock has duly advertised for bids for the Greenlawn Place Blue Tubing and Waterline Replacement Project, and WHEREAS, while only one bid was received from Murphy Pipeline Contractors, Inc . , the City Council has determined that the bid is acceptable, and WHEREAS, the City Council wishes to accept the bid of Murphy Pipeline Contractors, Inc . , Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City a contract with Murphy Pipeline Contractors, Inc . for the Greenlawn Place Blue Tubing and Waterline Replacement Project . The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 25th day of October, 07 . NY WEL , Mayor t of Round Rock, Texas T ST: - n adk/nel- CHRISTINE R. MARTINEZ, City Secr ary 0:\waox\RBsoLU'rI\R71025E1.wPD/MC GREENLAWN PLACE• ♦ WINDY � '•� • vl .mll��� • DATE: October 18, 2007 SUBJECT: City Council Meeting - October 25, 2007 ITEM: 11E1. Consider a resolution authorizing the Mayor to execute a construction contract with Murphy Pipeline Contractors, Inc. for the Greenlawn Place Blue Tubing and Waterline Replacement Project. Department: Water and Wastewater Utilities Staff Person: Michael Thane, P.E., Director of Utilities Justification: The city budgeted $1,950,640 to perform the replacement of 460 blue polybutylene water service lines with black polyethylene water service lines, and to replace asbestos cement (A/C) waterlines in Greenlawn Place Sections 1, 2, and 3; Windy Park Sections 1 and 2; and Windy Terrace Section 1. The engineer's cost estimate for the project was $2,040,480. Therefore, the single bid received was within both the budgeted and the estimated amounts. Areas for replacement of A/C waterlines were prioritized based on where the most waterline breaks are occurring within the City. All of the 6-inch and 8-inch A/C waterlines in Greenlawn Place Sections 1, 2, and 3; Windy Park Section 2; and Windy Terrace Section 1 are to be replaced with 8-inch waterlines under this contract. Funding• Cost: $1,742,781.01 Source of funds: Blue Tubing Fund ($607,906) Self Financed Utility Fund ($1,134,875.01) Outside Resources: S. D. Kallman, L.P. Background Information• There was one bidder on this project. The bid for the project is $1,742,781.01 for replacing the blue tubing service lines and the A/C water lines. Replacing water services and A/C waterlines benefits the City by: 1) disruption to the neighborhoods for repair work, 2) reducing unaccounted for water losses, and 3) reducing the burden on city water maintenance forces. Public Comment: N/A