Loading...
R-01-09-13-15F4 - 9/13/2001 RESOLUTION NO. R-01-09-13-15F4 WHEREAS, the City of Round Rock has previously entered into an agreement for engineering services ("Agreement") with Baker-Aicklen & Associates, Inc . for the reconstruction of Chisholm Trail from Chisholm Trail Hotel Centre to Wolle Lane, and WHEREAS, Baker-Aicklen & Associates, Inc . has submitted an Additional Services Authorization for a change in the scope of services, and WHEREAS, the City Council desires to enter into said Additional Services Authorization with Baker-Aicklen & Associates, Inc . , Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City an Additional Services Authorization for a change in the scope of services, a copy of said authorization being attached hereto as Exhibit "A" and incorporated herein for all purposes . The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551 , Texas Government Code, as amended. ::ODMA\WORLDOX\O:\WDOX\RESOLUTI\R10913F4.WPD/sc RESOLVED this 13th day of September, 2001 . NA e-�b ROB T A. STLUKA, JR. , Mayor City of Round Rock, Texas ATTEST : C /) /W JOJNNE LAND, City Secretary I7, Baker-Aicklen & Associates, Inc. Date 8/9/01 Engineers/Surveyors Proposal No.01-5084 ADDITIONAL SERVICES AUTHORIZATION Client Project No. CITY OF ROUND ROCK 601-559 Project Contract Date Proposed Improvements to Chisholm Trail 1/12/99 Subject of Additional Services Additional Services Project No. Off-site 12 inch water line 601-559-50, 51, 52 1. Remove approximately 3000 LF of 12-inch water line from Chisholm Trail improvement construction plans. Create new set of construction drawings and details for the 12-inch water line. $3,650. 2. Prepare bid documents and bid 12-inch water line project. $1,780. 3. Provide construction phase services for 12-inch water line project. $3,540. Reason For Change City Request. Compensation: Hourly charge plus reimbursable expense basis, as defined in the PROFESSIONAL SERVICES AGREEMENT, and in addition to the compensation for BASIC SERVICES. Total charges for these ADDITIONAL SERVICES are estimated to be approximately$_ X Lump sum charge basis plus reimbursable expenses, as defined in the PROFESSIONAL SERVICES AGREEMENT, and in addition to the compensation for BASIC SERVICES. Total charges for these ADDITIONAL SERVICES are to be $.8,970. Estimated Date of Completion: ASAP PREPARED BY: H. D. Rove, P. E. /VJ e PROPOSED BY: BAKER- KEN &ASSO IATES,INC. Z 9ro illiam Waeltr, Date APPROVED BY: � J Client: Date Title: (Sign, keep Client's copy&return all others. EXHIBIT I7, Baker-Aicklen & Associates, Inc. STANDARD RATE SCHEDULE Engineers/Surveyors (Labor Rate Table 35) Effective September, 2000, the following rates are recommended for work performed on an hourly-charge basis. Rates include company overhead and profit for services accomplished during regular working hours. DIRECT LABOR OFFICE PERSONNEL SERVICES Classification Rates Project Engineer/Surveyor/Planner ........................................................................................ $110.00 per hour Staff Engineer/Surveyor/Planner................................................................................................$95.00 per hour ProjectDesigner/Coordinator ................................................................................................... $85.00 per hour Engineering Assistant/Surveying Assistant/GPS Processor ..................................................... $70.00 per hour Senior Engineering/Surveying CAD Technician ...................................................................... $60.00 per hour Engineering/Surveying CAD Technician/Field Representative ............................................... $55.00 per hour CADDraftsman ........................................................................................................................ $45.00 per hour Secretary ................................................................................................................................... $45.00 per hour Expert Witness/Testimony/Deposition Services ................................................................... Two Times Rates Principal(as appropriate) ........................................................................................................ $120.00 per hour FIELD PARTY SERVICES Rates I-Man Field Party ..................................................................................................................... $70.00 per hour 2-Man Field Party ..................................................................................................................... $95.00 per hour 3-Man Field Party ................................................................................................................... $120.00 per hour 4-Man Field Party ................................................................................................................... $145.00 per hour GPS Field Unit with Operator(Note 5)................................................................................... $100.00 per hour GPS Field Unit without Operator(Note 5)................................................................................ $60.00 per hour DIRECT EXPENSES Transportation: By Firm's Passenger Vehicles(Note 1) ................................................................................ $ 0.35 per mile ByFirm's Survey Trucks (Notes 1, 2, 3 &4) ....................................................................... $ 0.35 per mile Subsistence of out-of-city work ............................................................................................... $100.00 per day Reproduction&Printing by Firm. ........................................................................................... Prevailing Com- Survey Stakes, Lathes, Iron Rods ....................................................................................... mercial Rates Or andother Direct Expense..................................................................................................... Cost, Plus 10% Notes: 1. A mileage charge will be billed for projects exceeding a 50-mile radius of the base office only. 2. Field Party rates include conventional equipment, supplies and survey vehicles. Abnormal use of stakes, lathes, etc., used such as during the construction phase of a project will be charged as indicated. 3. A minimum of two (2) hours field party time charge will be made for show-up time and return to office, resulting from inclement weather conditions, etc. 4. Field Party stand-by time will be charged for at the above-shown appropriate rates. 5. Rates apply to actual time GPS units are in use. All other time will be charged as appropriate normal field party rates. 6. The firm's professional liability is limited to the total amount of compensation associated with a specific project up to a maximum of$50,000. ]Baker-Aicklen & Associates, Inc. I,/� Engineers/Surveyors Ji p 2 Cn O<4D 64 N ame ad rlc E Chisholm Trail Street Improvements S Pw GAS DATE: September 7, 2001 SUBJECT: City Council Meeting— September 13, 2001 ITEM: *15.17.4. Consider a resolution authorizing the Mayor to execute an Additional Services Authorization with Baker Aicklen &Associates, Inc.for the reconstruction of Chisholm Trail from Chisholm Trail Hotel Centre to Wolle Lane. This supplement is for additional engineering services for the bidding and construction of the off-site 12-inch waterline along Chisholm Trail. The total charges for the additional services are $8,970. These additional services will increase the contract amount to $110,820.00. Resource: Jim Nuse, Director of Public Works Bill Stablein, Traffic Engineering Assoc. History: On August 9, 2001 the City Council approved R-01-08-09-13E1 to retain design and survey services the 12-inch waterline for Chisholm Trail Improvements project with Baker-Aicklen & Associates, Inc. Funding: Cost: $8,970 Source of funds: Self-Financed Utility Construction Funds Outside Resources: Baker-Aicklen& Assoc., Inc. Impact: This waterline will supply a secondary source of water to major business along the I-35 Frontage Road and Chisholm Trail. Benefit: The benefit of installing this waterline will not only add a secondary water source increasing the dependability of the water supply system, but will also facilitate the reconstruction of Chisholm Trail roadway. Public Comment: N/A Sponsor: N/A EXECUTED DOCUMENT FOLLOWS ORIGL .. I7, Baker-Aicklen 7� & Associates, Inc. Date 8/9/01 Engineers/Surveyors Proposal No.01-5084 ADDITIONAL SERVICES AUTHORIZATION Client Project No. CITY OF ROUND ROCK 601-559 Project Contract Date Proposed Improvements to Chisholm Trail 1/12/99 Subject of Additional Services Additional Services Project No. Off-site 12 inch water line 1 601-559-50, 51, 52 1. Remove approximately 3000 LF of 12-inch water line from Chisholm Trail improvement construction plans. Create new set of construction drawings and details for the 12-inch water line. $3,650. 2. Prepare bid documents and bid 12-inch water line project. $1,780. 3. Provide construction phase services for 12-inch water line project. $3,540. Reason For Change City Request. Compensation: Hourly charge plus reimbursable expense basis, as defined in the PROFESSIONAL SERVICES AGREEMENT, and in addition to the compensation for BASIC SERVICES. Total charges for these ADDITIONAL SERVICES are estimated to be approximately$_ X Lump sum charge basis plus reimbursable expenses, as defined in the PROFESSIONAL SERVICES AGREEMENT, and in addition to the compensation for BASIC SERVICES. Total charges for these ADDITIONAL SERVICES are to be $.8,970. Estimated Date of Completion: ASAP PREPARED BY: H.D.Roe P. E. 00 PROPOSED BY: BAKER-A LASSOCqATES,JNC. Date APPROVED BY: �{ - 9-13--01 Clien : Date Title: (Sign,keep Client's copy&return all others. Baker-Aicklen & Associates, Inc. STANDARD RATE SCHEDULE Engineers/Surveyors (Labor Rate Table 35) Effective September, 2000, the following rates are recommended for work performed on an hourly-charge basis. Rates include company overhead and profit for services accomplished during regular working hours. DIRECT LABOR OFFICE PERSONNEL SERVICES Classification Rates Project Engineer/Surveyor/Planner ........................................................................................ $110.00 per hour Staff Engineer/Surveyor/Planner................................................................................................$95.00 per hour Project Designer/Coordinator ................................................................................................... $85.00 per hour Engineering Assistant/Surveying Assistant/GPS Processor ..................................................... $70.00 per hour Senior Engineering/Surveying CAD Technician ...................................................................... $60.00 per hour Engineering/Surveying CAD Technician/Field Representative ............................................... $55.00 per hour CADDraftsman ........................................................................................................................ $45.00 per hour Secretary ................................................................................................................................... $45.00 per hour Expert Witness/Testimony/Deposition Services ................................................................... Two Times Rates Principal (as appropriate) ........................................................................................................ $120.00 per hour FIELD PARTY SERVICES Rates 1-Man Field Party ..................................................................................................................... $70.00 per hour 2-Man Field Party ..................................................................................................................... $95.00 per hour 3-Man Field Party ................................................................................................................... $120.00 per hour 4-Man Field Party ................................................................................................................... $145.00 per hour GPS Field Unit with Operator(Note 5)................................................................................... $100.00 per hour GPS Field Unit without Operator(Note 5)................................................................................ $60.00 per hour DIRECT EXPENSES Transportation: By Firm's Passenger Vehicles (Note 1) ................................................................................ $ 0.35 per mile By Firm's Survey Trucks (Notes 1, 2, 3 &4) ....................................................................... $ 0.35 per mile Subsistence of out-of-city work ............................................................................................... $100.00 per day Reproduction&Printing by Firm. ........................................................................................... Prevailing Com- Survey Stakes, Lathes, Iron Rods ....................................................................................... mercial Rates Or andother Direct Expense..................................................................................................... Cost, Plus 10% Notes: 1. A mileage charge will be billed for projects exceeding a 50-mile radius of the base office only. 2. Field Party rates include conventional equipment, supplies and survey vehicles. Abnormal use of stakes, lathes, etc., used such as during the construction phase of a project will be charged as indicated. 3. A minimum of two (2) hours field party time charge will be made for show-up time and return to office, resulting from inclement weather conditions, etc. 4. Field Party stand-by time will be charged for at the above-shown appropriate rates. 5. Rates apply to actual time GPS units are in use. All other time will be charged as appropriate normal field party rates. 6. The firm's professional liability is limited to the total amount of compensation associated with a specific project up to a maximum of$50,000. —Baker-Aicklen I � & Associates, Inc. I___ _IEngineers/Surveyors