R-01-09-13-15F9 - 9/13/2001 RESOLUTION NO. R-01-09-13-15F9 WHEREAS, the City of Round Rock has previously entered into a contract for engineering services ("Contract") with Carter & Burgess, Inc . for the preparation of plans, specifications, and estimates for 1 . 5 miles of US 79 from FM 1460 to CR 195, and WHEREAS, Carter & Burgess, Inc . has submitted Supplemental Agreement No . 2 to the Contract for a change in the scope of services, to develop plans and specifications for additional illumination of US 79 and WHEREAS, the City Council desires to enter into said Supplemental Agreement No. 2 to the Contract with Carter & Burgess, Inc . , Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City Supplemental Agreement No. 2 to the Contract with Carter & Burgess, Inc . for a change in the scope of services, a copy of said supplemental agreement being attached hereto as Exhibit "A" and incorporated herein for all purposes . The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the ::CDMA\WORLDOX\0:\WDOX\RESOLUTI\R10913F9.WPD/SC public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 13th day of September, 2001 . A 'dA RO A. STLUKA, JR. , Mayor City of Round Rock, Texas ATTEST: C�AA J NE LAND, City Secretary 2 STATE OF TEXAS * Contract No. COUNTY OF WILLIAMSON SUPPLEMENTAL AGREEMENT NO. 2 CONTRACT FOR ENGINEERING SERVICES THIS SUPPLEMENTAL AGREEMENT to contract for engineering services is made by and between the City of Round Rock, hereinafter called the "City", and Carter-Burgess, Inc., hereinafter called the "Engineer", and becomes effective when fully executed by both parties. WITNESSETH WHEREAS, the City and the Engineer executed a contract on the 23`d day of March 2000 concerning the design of a four-lane divided section on US 79 from FM 1460 to CR 195 to include bridge design at Arterial A; and, WHEREAS, Article 2, Scope of Services To Be Provided by Engineer, as amended, establishes engineering services to be performed in fulfillment of the Contract; and, WHEREAS, Article 4. Compensation, as amended, limits the maximum amount payable for the contract to $556,300; and, WHEREAS, it has become necessary to further amend the contract; AGREEMENT NOW THEREFORE, premises considered, the City and the Engineer agree that said contract is amended as follows: I. The Engineer will be performing additional work concerning the development of plans and specification for the additional illumination of US 79 from IH-35 to CR 122, excluding those sections already developed for illumination in this project, as shown in Exhibit B. H. The maximum amount payable of the contract is increased by$68,021.00, as shown in Exhibit D, to $624,321.00. EXHIBIT 1 of "All ALL OTHER PROVISIONS ARE UNCHANGED AND REMAIN IN FULL FORCE AND EFFECT. IN WITNESS WHEREOF, the City and the Engineer have executed this supplemental agreement in duplicate. THE CITY THE ENGINEER By: By: M ,— U'(-� Robert Stluka F. Cl f Davis, P. E. Mayor Senior Vice President f O Date Date LIST OF EXHIBITS: Exhibit B —Additional Services to be Provided by the Engineer Exhibit D—Fee Schedule 2of2 CONTRACT NO. EXHIBIT "B" ADDITIONAL SERVICES TO BE PROVIDED BY THE ENGINEER PROJECT: US 79 LIMITS: From IH 35 to CR 122 COUNTY: Williamson Project limits were extended from west of FM 1460 to IH 35. As a result, Carter& Burgess, Inc., herein after called the ENGINEER, shall provide the following additional services: The extension was necessitated by the City's request to provide continuous illumination from IH 35 to the extreme eastern limits of the existing project. This will require additional survey work from IH 35 to FM 1460. This control and design survey work is outlined in Exhibit"D", Survey Estimate. Additional illumination design will be provided from IH 35 to Harrell Parkway and from just west of Chandler Branch to CR 122. CARTER BURGESS,INC. EXHIBIT"D" Contract No. FEE SCHEDULE US 79 From:IH 35 To:CR 122 TASK AND DESCRIPTION STANDARD NO.OF I PROJECT SENIOR DESIGN ENGINEER I SENIOR CADD CLERICAL TOTAL HRS/SHT SHEETS SHEETS MANAGER ENGINEER ENGINEER DESIGNER1 OPERATOR IHRSf$HTI HOVR3 IHRS/SHTI HOURS IHRSISHTI HOURS IHRSSWI HOURS HRS/SHT HOURS HRS/SHT HOURS IHRS/SHTI HOURS ILLUMINATION LAYOUTS 100 Scale FC 163 SUBTOTALS 37 22 46 0 0 272 128.75 0 468.75 13 1 US79RR-Illumination-07-18-01 CARTER BURGESS,INC. EXHIBIT "101" Contract No. FEE SCHEDULE US 79-From: IH 35 To:CR 122 TASK AND DESCRIPTION ILLUMINATION PROJECT SENIOR DESIGN ENGINEER SENIOR CADD CLERICAL TOTAL MANAGER ENGINEER ENGINEER DESIGNER DRAFTER TOTAL HOURS: 22 46 0 0 272 129 0 468.75 SALARY RATES: $47.00 $37.00 $29.45 $20.50 $30.00 $17.85 $15.50 $32.88 DIRECT SALARY COSTS: $1,034 $1,702 $0 $0 $8,160 $2,298 $0 $13,194 OVERHEAD MULTIPLIER: 1.6297 $1,685 $2,774 $0 $0 $13,298 $3,745 $0 $21,503 PROFIT. 15.00% $408 $671 $0 $0 $3,219 $907 $0 $5205 1 7 5,147 0 0 24,677 6,950 2 US79RR-Illumination-07-18-01 Exhibit"D" 31-Jul-01 Carter Burgess SURVEY ESTIMATE DESIGN SURVEY FOR US 79 from IH35 to FM1460(9,500 L.F.) Illumination Design Survey- C&B TRANSPORTATION UNIT Hourly Rate:1 $45 $75 1 $110 $105 $120 1 $145 No. Description Clerical Technician RPLS 2Man Crew Wan Crew I 3Man/GPS Totals �] CONTROL SURVEY 1 Recover Primary Horizontal &Vertical Survey Control by others 10 0.5 9 $2,110 2 Extend &establish secondary survey control within project limits 20 2 _ 18 $4,330 SUBTOTAL CONTROL 30 s(- 2.5 27 $6,440 ; DESIGN SURVEY 1 Field tie outside edge of pavement/C&G each side of US79 @ 100' intervals _ 2 1 _ 18 $2,870 2 Approximate location and field ties to existing ROW fence/line as available 1.5 0.5 13.5 $2,125 3 Field tie inside&outside edge of pavement/C&G @ IH35, east ramps 0.5 4.5 $690 4 Field tie inside&outside edge of pavement/C&G @ N. Mays intersection 0.5 4.5 $690 5 Field locate all visible&accessible overhead utilities within N&S corridors 1 0.5 9 $1,435 6 Field locate all visible&accessible underground utilities within N&S corridors 2 1 18 $2,870 7 Field locate all visible&accessible wastewater facilities within N&S corridors 0.5 4.5 $690 8 Field locate all visible&accessible storm drain facilities within N&S corridors 1 0.5 9 $1,435 9 Field locate all median crossings for the design route 0.5 4.5 $690 10 Field locate centerline of driveways, and flowline of driveway culverts 9 $1,305 11 Process, plot&review data-provide digital file to Transportation 80 8 $6,880 SUBTOTAL DESIGN SURVEY " 89.5: 11.5 94:5 $21;680'=' Total Hours: 119.5 14 121.5 $28,120 Total Days: 15 2 14 Total Months: 1 0 1 US79R R-Illumination/Survey-07-18-01 , r " 1 ��'' � � - v",we - � � - �v r 0100 1•t 1� t J � �V� _1 '1c�, � .C',-�3y'��''q��I �'__ �.� v�-��'F�? � � �/ I t-�- - � \/ \� -/� ���- c -t .t � �' �.r•}�..�/�5 ���fir� 4Ia{ �yjS°ply ft�,i. p )i ti �rlr I,/ ti t 4 T� mJ1� �il 3'�'uht' - �S�.y'c�ri6�,5� 77 L C �et- Rr1�_ � Aw �� J `t t1`, E r,�S NTri111 a 1 ; -- �,- - F J r>n �a fi I'M � � � ger _ ;rUn�,� �r � - - { .,,t + i/. r4 �i.r� L� I�1 � i ) V.- t ;�1.3 `✓i✓x ' t — .. �>' >Y✓� j{" ( � ' ✓ - .a-� i I tr�iriY'1� 1 �L i � ff N Dov ss d�a WIN c� U. S. 79 from I H 35 to CR 122 .. k IS �• �;�s DATE: September 7, 2001 SUBJECT: City Council Meeting—September 13, 2001 ITEM: *15.F.9. Consider a resolution authorizing the Mayor to execute Supplemental Agreement No. 2 to the Contract for Engineering Services with Carter & Burgess, Inc.for the preparation of plans, specifications, and estimates for 1.5 miles of additional illumination of US 79 from CR 195 to FM 1460. This Supplemental Agreement provides for the development of plans and specifications for the construction of continuous roadway lighting on US 79 from IH 35 to CR 122 at a cost $68,021.00. Resource: Jim Nuse, Director of Public Works Tom Word, Chief Traffic Engineer History: The original contract was approved on March 23, 2000, by council by resolution no. R-00-03-23-13A4 for preparation of plans, specifications, and estimates for 1.5 miles of US 79 from County Road 195 to FM 1460. Supplemental Agreement No. 1 that extended the contract to December 31, 2002 and modified the Scope of Work to extend the project limits to 1400 feet west of FM 1460 was approved at the June 28"', 2001 council meeting. Supplemental Agreement No. 2 is in the amount of $68,021.00 and will change the scope of services to include additional work necessitated by the request for additional continuous illumination and extension of the project limits. This will bring the total cost of the contract to $624,321.00. Funding: Cost: $68,021.00 Source of funds: Transportation Capital Improvement Program Outside Resources: Carter Burgess, Inc. Impact/Benefit: This project will improve safety and mobility for this road. Public Comment: N/A Sponsor: N/A EXECUTED DOCUMENT FOLLOWS ORIGINAL STATE OF TEXAS * Contract No. COUNTY OF WILLIAMSON SUPPLEMENTAL AGREEMENT NO. 2 CONTRACT FOR ENGINEERING SERVICES THIS SUPPLEMENTAL AGREEMENT to contract for engineering services is made by and between the City of Round Rock, hereinafter called the "City", and Carter-Burgess, Inc., hereinafter called the "Engineer", and becomes effective when fully executed by both parties. WITNESSETH WHEREAS, the City and the Engineer executed a contract on the 23rd day of March 2000 concerning the design of a four-lane divided section on US 79 from FM 1460 to CR 195 to include bridge design at Arterial A; and, WHEREAS, Article 2, Scope of Services To Be Provided by Engineer, as amended, establishes engineering services to be performed in fulfillment of the Contract; and, WHEREAS, Article 4. Compensation, as amended, limits the maximum amount payable for the contract to $556,300; and, WHEREAS, it has become necessary to further amend the contract; AGREEMENT NOW THEREFORE, premises considered, the City and the Engineer agree that said contract is amended as follows: I. The Engineer will be performing additional work concerning the development of plans and specification for the additional illumination of US 79 from IH-35 to CR 122, excluding those sections already developed for illumination in this project, as shown in Exhibit B. 11. The maximum amount payable of the contract is increased by$68,021.00, as shown in Exhibit D, to $624,321.00. 1 of 2 ALL OTHER PROVISIONS ARE UNCHANGED AND REMAIN IN FULL FORCE AND EFFECT. IN WITNESS WHEREOF, the City and the Engineer have executed this supplemental agreement in duplicate. THE CITY THE ENGINEER Y R ert Stluka F. Clif Davis, P. E. Mayor Senior Vice President 9-13 -01 1jo I Date Date LIST OF EXHIBITS: Exhibit B —Additional Services to be Provided by the Engineer Exhibit D—Fee Schedule 2of2 CONTRACT NO. EXHIBIT "B" ADDITIONAL SERVICES TO BE PROVIDED BY THE ENGINEER PROJECT: US 79 LIMITS: From IH 35 to CR 122 COUNTY: Williamson Project limits were extended from west of FM 1460 to IH 35. As a result, Carter& Burgess, Inc., herein after called the ENGINEER, shall provide the following additional services: The extension was necessitated by the City's request to provide continuous illumination from IH 35 to the extreme eastern limits of the existing project. This will require additional survey work from IH 35 to FM 1460. This control and design survey work is outlined in Exhibit"D", Survey Estimate. Additional illumination design will be provided from IH 35 to Harrell Parkway and from just west of Chandler Branch to CR 122. CARTER BURGESS,INC. EXHIBIT"D" Contract No. FEE SCHEDULE US 79 From:IH 35 To:CR 122 TASKAND DESCRIPTION STANDARD NO.OF I PROJECT I SENIOR DESIGN L ENGINEER I SENIOR CADD �HRS/SHTJ LERICAL TOTAL H_R_S/SHT SHEETS SHEETS MANAGER ENGINEER ENGINEER DESIGNER OPERATOR HRS/SHT HOURS HRS/SHT HOURS HRS/SHT HOURS HRS/SHT HOURS HRS/SHT HOURS HRS/SHT HOURS HOURS ILLUMINATION LAYOUTS (100 Scale)(FC 163) Slenation Layouts Summummarries 22 1 22 2 44 0 0 0 0 12 264 5 110 0 440 24 s 2 1 2 4 8 8 4 Standards: 11 0.25 2.75 235 0.25 Miscellaneous Illumination Details 2 0 0 1 2 0 0 0 0 0 8 16 18 9 SUBTOTALSI 1 37 22 46 0 0 272 128.75 0 468.75 13 1 US79RR-Illumination-07-18-01 CARTER BURGESS,INC. EXHIBIT "D" Contract No. FEE SCHEDULE US 79-From: IH 35 To:CR 122 TASK AND DESCRIPTION ILLUMINATION PROJECT SENIOR DESIGN ENGINEER SENIOR CADD CLERICAL TOTAL MANAGER ENGINEER ENGINEER DESIGNER DRAFTER _ TOTAL HOURS: _ 22 46 0 0 272 129 0 468.75 _ SALARY RATES: $47.00 $37.00 _$29.45 $20.50 __s30 00 $17.85 $15.50 $32.88 DIRECT SALARY COSTS: $1,034 $1,702 $0 $0 - $8,160 $2,298 $0 $13,194 OVERHEAD MULTIPLIER 1.6297 $1,685 $2,774 $0 $0 $13,298 $3,745 $0 $21,503 -- - PROFIT: 15.00% $408 1 $671 1 $0 1 $0 $3,219 $907 $0 $5,205 TOTAL: $3,127 5,147 0 0 $24,677 6,950 0 39,901 I 2 US79RR-I Ilumination-07-18-01 Exhibit "D" 31-Jul-01 Carter.- Burgess SURVEY ESTIMATE ' DESIGN SURVEY FOR US 79 from IH35 to FM1460 (9,500 L.F.) Illumination Design Survey- C&B TRANSPORTATION UNIT Hourly Rate: $45 $75 $110 1 $105 1 $120 $145 No. Description Clerical Technician RPLS 2Man Crew Wan Crew 3Man/GPS Totals J CONTROL SURVEY � 1 Recover Primary Horizontal &Vertical Survey Control by others 10 0.5 9 $2,110 2 Extend & establish secondary survey control within project limits 20 2 18 $4,330 SUBTOTAL CONTROL 30 2.5 27 $6,440 DESIGN SURVEY -- -- 1 Field tie outside edge of pavement/C&G each side of US79 @ 100' intervals 2 1 18 $2,870 2 Approximate location and field ties to existing ROW fence/line as available 1.5 0.5 13.5 $2,125 3 Field tie inside& outside edge of pavement/C&G @ I1-135, east ramps 0.5 4.5 $690 - - - - 4. 4 Field tie inside & outside edge of pavement/C&G @ N. Mays intersection 0.5 4.5 $690 5 Field locate all visible & accessible overhead utilities within N&S corridors 1 0.5 9 $1,435 6 Field locate all visible&accessible underground utilities within N&S corridors _ -2 1 18 $2,870 7 Field locate all visible & accessible wastewater facilities within N&S corridors 0.5 4.5 $690 8 Field locate all visible&accessible storm drain facilities within N&S corridors 1 0.5 9 $1,435 9 Field locate all median crossings for the design route 0.5 4.5 $690 10 Field locate centerline of driveways, and flowline of driveway culverts ! 1 9 $1,305 1 Process, plot& review data- provide digital file to Transportation 80 8 $6,880 SUBTOTAL DESIGN SURVEY 89.5 11.5 94.5 $21,680 Total Hours: 119.5 14 121.5 $28,120 Total Days: 15 2 14 Total Months: 1 0 1 U S 79 R R-111 u m i n atio n/Survey-07-18-01