R-01-09-13-15F13 - 9/13/2001 RESOLUTION NO. R-01-09-13-15F13 WHEREAS, the City of Round Rock has duly advertised for bids for the Distribution System Pressure Improvements, High Country P.R.V. Station and IV-6 and IV-7 Bypass, and WHEREAS, Benitez Construction, Inc . has submitted the lowest responsible bid, and WHEREAS, the City Council wishes to accept the bid of Benitez Construction, Inc . , Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City a contract with Benitez Construction, Inc . for the Distribution System Pressure Improvements, High Country P.R.V. Station and IV-6 and IV-7 Bypass . The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 13th day of Sept e 2001 111�6 I A. TLUKA, . , Mayor JCity of Round Rock, Texas T w) JO P2LnAND�, City Secretary ::ODMA\WORLDOX\O:\WDOX\RESOLUTI\R10913F.13/sc , , , _ rvS6&7 p •___- i >: -� �, it - 1 7 i= �.i \ F - - Jl - � \ t fp '.t , , ,._ .... , .,,, .: ,,-, .� 1._,_,.r ., ..__`' � •i, _ '� � _._..._ \�- -. � \,- 4 I- ,t AI- . � Vi,Y ` •' +t --_..` t ';.. � _t-- O�`�i.FT._ '\ = 1 �� � � � , .arm i -- 4 /.� QY.��TT - + , i N A nd R HIGH COUNTRY P.R.V.& IV'S6 & 7pw Gl$ S\GRAPHICS\COUNCIL AGENDA TTEMS\ENGINEERING\8-27-0I\HIGH COUNTRY PRV RLR 8-2701 s Bid Tab ulatlon City of Round Rock N Distribution System Pressure Improvements-HIgh Country c Wds Opaned August 28,2001,2:OG P M (Q Bidder; Southwest Cornerstone Richard Waters Const Be ez C L Ch asco contract7na Peabody Gen,Const. Nelson Lewis Bld Bond Z.G.Carlton Ind. Y Y Y Y Y Y Y Acknowledge Receipt of Addanda N Y Y Y N Y Y Bid item N Descrintlon Total Price Total Price Total P rice Total PrIce Base Bid Items Total Price o Pr W I Price ( 1 Mobiltxatlon I i 7,500.ODI . 5,,000.,00 Si 554,,500000..0000 I; 490,,000000..000 6,500.01)91,150. 0 6202 PressureReducing Valve Station and Vault , 8 I S 57,000.00 10 Bxcavado•-•Gaft`Y SyaidRs 3 2,50u.w J 3 6,irFii.3v $ 3,300.00 ; '<,'u0D,00 1.2517,0V $ III) NU 3 5,000,04 F, 4 3D-Inch Bypass I; 51,000.00 66.059.10 ; 69,000.00 S 96,000.00 > 65,56D.OD i 114,000.00 ; 91,100.00 `W 5 Trench Safety Systems ; 2,500.00 IIS 9,999.00 ; 1,000.00 i 2,000.00 ; 759,00�; 10,000.OD,S 1,500.00 IMI Total Base Bid Arnounl, Sum of Items 1.5: S 154 BSD.00 S 162 916 50 S 123,500.01) S 17t DDD.00 S 1 Z7 OOD.0o $ i D3,000.0D $ 1fi1,i 00.00 T OF 0 . y •- d. 41 NEIL A... a ..,....... .« . ........ xp•:•� 79287 :��v .F o TA0.SE,.. � m OD N N .-1 W O O O O N 7 DATE: September 7, 2001 SUBJECT: City Council Meeting— September 13, 2001 ITEM: 15.F.13. Consider a resolution authorizing the Mayor to execute a Contract with Benitez Construction, Inc.for the Distribution System Pressure Improvements, High Country P.R.V. Station and IV-6 and IV-7 Bypass. Bids were received and opened at 2:00 P.M. on Tuesday, August 28, 2001. The low bidder was Benitez Construction, Inc. for the amount of$123,500.00. This project is to upgrade the southwest and southeast areas of our water distribution system, which is necessary to deliver adequate water pressure and sustained fire flows to the Forest Ridge, Fern Bluff, and Brushy Creek areas during peak summer demands. Resource: Jim Nuse, Director of Public Works Don Rundell, Chief Utilities Engineer History: This project is to upgrade the southwest and southeast areas of our water distribution system, which is necessary to deliver adequate water pressure and sustained fire flows to the Forest Ridge, Fern Bluff, and Brushy Creek areas during peak summer demands. We received seven (7) bids with an average bid of $153,309.50. The high bid was $183,000.00 from Nelson Lewis and the low bid of$123,500.00 was from Benitez Construction, Inc. This project has a construction time of 75 calendar days. Funding: Cost: $123,500.00 Source of funds: Self Financed Utility Construction Funds Outside Resources: HDR Engineering Impact: To maintain the integrity and reliability of our water systems ability to meet fire flow demand during peak summer demands. Benefit: To minimize the potential of system failure, which could result in critical water shortages putting to our customers' health and safety at risk. Public Comment: N/A Sponsor: N/A