Loading...
R-01-09-13-15F14 - 9/13/2001 RESOLUTION NO. R-01-09=13-15F14 WHEREAS, the City of Round Rock desires to retain site inspection services for the South 81 Elevated Storage Tank project, and WHEREAS, HOT Inspection Services, Inc . has submitted an inspection proposal to provide said services, and WHEREAS, the City Council desires to approve said proposal, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City an inspection proposal with HOT Inspection Services, Inc . for inspection services for the South 81 Elevated Storage Tank project, a copy of said proposal being attached hereto as Exhibit "A" and incorporated herein for all purposes . The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 13th day of Se r, 200; . Al kwwy"Si4li RO ERT A. STLU , JR. , Mayor City of Round Rock, Texas T J E LAND, City Secretary ::ODMA\WORLDOX\0:\WDOX\RESOLU'2I\R10913F.14/sc 1.25MMG ELEVATED STORAGE TANK INSPECTION PROPOSAL HOT Inspection Services,Inc. (HOT) hereby offers to perform the following work on the 1.25MMG Elevated Water Storage Tank Project at the price,terms,and conditions listed herein: SCOPE: HOT proposes to provide welding inspection and testing and coating inspection and testing on the referenced project for The City of Round Rock. The objective of this project is to provide quality assurance surveillance of the welding,erection,sandblasting,and painting during the construction of the water tank. Inspection and testing visits will be strategic and at the discretion of the Owner/Engineer. The services to be rendered will include the following: Welding, Fabrication and Erection Inspection -Review tank project drawings to provide comments and recommendations. -Review welder qualification records,welding procedures,and mill test reports before any welding commences. -Verify proper welding electrodes and electrode storage to be used on project. -Conduct inspections on shop fabricated components. -Conduct inspection of tank erection practices and fit-up. -Conduct Certified Welding Inspection per AWWA D100 during construction. The inspection methods to be implemented for the above inspection will consist of Visual Testing(VT)and Radiographic Testing(RT). All inspections will verify compliance with the AWWA D100-96 Standard and Contract Specifications. 1. Shop fabricated items will be inspected on site as they arrive unless a shop visit is requested by the owner. The fabrication and weld quality will be inspected for compliance to AWWA D100-96. If a shop inspection is required by the owner, it shall consist of a visual inspection of the fabricating practices and operations to determine compliance with the AWWA Standard. 2. Field erection and welding will be inspected for compliance to the AWWA Standard. The inspection procedures will parallel the procedures listed in Section 11.2. The quality of field welding shall be determined by visual inspections on all joint fit-up and welding. Radiographic testing will be conducted as specified in Section 11.5. All test locations will be selected by HOT and the radiographs will be graded. 3. Radiographic Testing may be provided by the Contractor unless specified otherwise in the contract documents. In either case HOT will provide the location selection of each shot and grade each radiograph. EXHIBIT "A Page 2. S81 Proposal Sandblasting and Coating Inspection -Pre-surface preparation inspection. -Measurement of ambient conditions. -Evaluation of compressor and surface preparation equipment. -Determination of surface preparation cleanliness and profile. -Inspection of application equipment. -Witnessing coating mixing. -Inspecting coating application. -Determination of wet film thickness. -Determination of dry film thickness. -Evaluating cleanliness between coats. -Conduct holiday testing of the inside coating system below the top capacity level. -Evaluate cure. -Finalize inspection and testing of project by submitting a final report to engineer and owner. The inspection methods to be implemented for the sandblasting and coating inspections will consist of visual inspections,mil gauging, holiday testing,profile gauging and atmospheric measuring. All inspections will verify compliance with the AWWA D102-97 and contract specifications. 1. The measurement of air temperature, surface temperature,humidity, dew point,coating thickness and holiday detection will be recorded in an inspectors log book. The equipment to obtain such measurements will be supplied by HOT. WORK EXCLUDED: Work required for safely accessing the tank is not included in the cost of this project. It will be the contractor's responsibility for providing safe access to all areas of the tank for inspection and testing during the construction. OSHA approved scaffolding and shell buggies will be necessary for the complete access of the tank. Page 3. S81 Proposal PRICE: The cost for the above mentioned service is based on an hourly rate of$65.00/hr for Welding Inspection and Coating Inspection. If contract requires contractor to furnish and pay for Radiographic Testing, then HOT will select the locations of X-rays and grade film. The cost of Services mentioned above is as follows: WELDING AND ERECTION INSPECTION.........................................................$6,240.00 NOTE. BASED ON 96 HOURS(3 HR MIN. CHARGED EACH SITE VISIT) SURFACE PREPARATION AND PAINTING INSPECTION(field)..................................................$4,875.00 NOTE. BASED ON 75 HOURS(3 HR MIN. CHARGED EACH SITE VISIT) SURFACE PREPARATION AND PAINTING INSPECTION(shop)..................................................$3,500.00 NOTE. BASED ON 3 DAYS AT SHOP IN DES MOINES, IOWA (TIME ONLY) TOTAL COST OF SERVICE..............................................................$149615.00 All work will be conducted and billed at an hourly rate as shown above. The budget cost for conducting the inspection will not exceed the cost above without written approval from the owner/representative. Once the cost approaches the budget cost,the owner will be notified and informed of the remaining work required to complete project TERMS: This proposal is offered to acceptance within 45 days. Payments to be made within 30 days of invoice date. CONDITIONS: This proposal assumes that the tank will be accessible for inspection and that any restrictions requiring special work will affect the cost of this proposal. INSURANCE: HOT to provide insurance certificate upon request. TIME OF PERFORMANCE: All inspection visits will be scheduled with the engineer and contractor if required for performing the necessary inspection and testing. Page 4. S81 Proposal ACCEPTANCE: Should you find this proposal acceptable at the prices,terms, and conditions offered, please indicate your acceptance by signing in the space provided. Executed on this the day of 2001. 7ZACCEPTED ACCEPTED en Robert A. Stluka, Jr., Mayor den City Of Round Rock,Texas nI Zction S ices, Inc. 0 a � p o SUBJECT TRACT N end Ro 44 -� SOUTH 81 TANK SITE W G1S SGMAY6ICWNCR AGE�MI18A5/ENGINEEFtlNM 1-7800 DATE: September 7, 2001 SUBJECT: City Council Meeting— September 13, 2001 ITEM: 15.17.14. Consider a resolution authorizing the Mayor to execute an inspection proposal with HOT Inspection Services, Inc.for inspection services for the South 81 Elevated Storage Tank project. This inspection is being done for the relocation of the existing .5 mg tank with the new 1.25 mg tank for the South Mays/Dell Way project. Resource: Jim Nuse, Director of Public Works Ronnie Jean, Utility Maintenance Manager History: This inspection is being done for the relocation of the existing .5 mg tank with the new 1.25 mg tank for the South Mays/Dell Way project. Funding: Cost: $14,615 Source of funds: Self Financed Utility Construction Fund Outside Resources: HOT Inspection Impact: Increase water storage capacity. Benefit: Elevated tank will ensure better water pressure. Public Comment: N/A Sponsor: N/A 08/15/2002 THU 14: 49 FAX Z 002/002 COUNTY WIDE TNTF,R-ACrFNCY COMMUNTCATTONS SYSTEMS MEETING TIIURSDAY, AUGUST 22, 2002 —9:00 A.M. ROUND ROCK CENTRAL FIRE STATION 203 COMMERCE BLVD. R0UND ROCK, -1-FAAS, WII.I.1AMSON COI. N'I'Y MEMBERS LYNN BIZZELL, Chairperson JAMES MALLINGER, Vice-Chairperson ANTHONY LINCOLN, Secretary JOHN DOERFLER KEVIN STOFLE RICK THOMAS SHAWN NEWSOME BUTCH DL-MPSEY KEN GRAALUM ALAIN FABTN TERRY JONES ME-LLISSA POGUE, A;'vlvt,E~NP;L-2aG> NA 1. Call meeting to order— 9:00 A.M. 2. Roll call 3. C.'iti7en's Communications 4. Revicw and approve of minutes: July 25, 2002 5. Discussion and possible action on talk groups. 6. Discussion on System Manager 7. Discussion and possible action on interlocal Agreement 8. CWICS Budget 9. Set next Agenda Ttems 10. Adjournment CFRTTFTCATF, I certify that the above notice of a County Wide Inter-Agency Communications System meeting was posted on the bulletin boards at the City Hall of the City of Round Rock, at the City hall of the City of Cedar Park, at the City Hall of the City of Georgetown, and at the Old Williamson County Courthouse in the City of Georgetown, 'Texas, on the 15th day of August, 2002 at 5:00 P.m. 2 LYNN BIZZEL, Chairperson AUG-15-2002 15:32 95% P.02 08/15/2002 THU 14:49 FAX ?0011002 CWICSCounty Wide Inter-Agency Communications System Cily r;f Gewrl,,eluK-n Cily ujRuund Ruck Willimnsun Counlr TELEFAX TRANSMISSION COVER PAGE DATE: August 15, 2002 TOTAL PAGES (INCLUDING COVER): 2 ATTENTION: Christine Martinez COMPANY: City Hall Administration FAX #: 512-218-7097 FROM: Lynn Bizzell, Chanperson Round Rock Fire Chief City of Round Rock 203 Commerce Blvd. (Voice) 512-218-6630 Round Rock,TX 78664 (Fox) 512-218-5594 COMMENTS: CWICS Agenda CALL 512-218-6631 IF ALL PAGES ARF NOT RECEIVED. AUG-15-2002 15:32 95% P.01 EXECUTED DOCUMENT FOLLOWS (ORIGINAL 1.25MMG ELEVATED STORAGE TANK INSPECTION PROPOSAL HOT Inspection Services, Inc. (HOT) hereby offers to perform the following work on the 1.25MMG Elevated Water Storage Tank Project at the price, terms,and conditions listed herein: SCOPE: HOT proposes to provide welding inspection and testing and coating inspection and testing on the referenced project for The City of Round Rock. The objective of this project is to provide quality assurance surveillance of the welding, erection, sandblasting,and painting during the construction of the water tank. Inspection and testing visits will be strategic and at the discretion of the Owner/Engineer. The services to be rendered will include the following: Welding, Fabrication and Erection Inspection -Review tank project drawings to provide comments and recommendations. -Review welder qualification records,welding procedures,and mill test reports before any welding commences. -Verify proper welding electrodes and electrode storage to be used on project. -Conduct inspections on shop fabricated components. -Conduct inspection of tank erection practices and fit-up. -Conduct Certified Welding Inspection per AWWA D100 during construction. The inspection methods to be implemented for the above inspection will consist of Visual Testing(VT) and Radiographic Testing(RT). All inspections will verify compliance with the AWWA D100-96 Standard and Contract Specifications. 1. Shop fabricated items will be inspected on site as they arrive unless a shop visit is requested by the owner. The fabrication and weld quality will be inspected for compliance to AWWA D100-96. If a shop inspection is required by the owner, it shall consist of a visual inspection of the fabricating practices and operations to determine compliance with the AWWA Standard. 2. Field erection and welding will be inspected for compliance to the AWWA Standard. The inspection procedures will parallel the procedures listed in Section 11.2. The quality of field welding shall be determined by visual inspections on all joint fit-up and welding. Radiographic testing will be conducted as specified in Section 11.5. All test locations will be selected by HOT and the radiographs will be graded. 3. Radiographic Testing may be provided by the Contractor unless specified otherwise in the contract documents. In either case HOT will provide the location selection of each shot and grade each radiograph. Page 2. S81 Proposal Sandblasting and Coating Inspection -Pre-surface preparation inspection. -Measurement of ambient conditions. -Evaluation of compressor and surface preparation equipment. -Determination of surface preparation cleanliness and profile. -Inspection of application equipment. -Witnessing coating mixing. -Inspecting coating application. -Determination of wet film thickness. -Determination of dry film thickness. -Evaluating cleanliness between coats. -Conduct holiday testing of the inside coating system below the top capacity level. -Evaluate cure. -Finalize inspection and testing of project by submitting a final report to engineer and owner. The inspection methods to be implemented for the sandblasting and coating inspections will consist of visual inspections, mil gauging, holiday testing, profile gauging and atmospheric measuring. All inspections will verify compliance with the AWWA D102-97 and contract specifications. 1. The measurement of air temperature, surface temperature, humidity, dew point,coating thickness and holiday detection will be recorded in an inspectors log book. The equipment to obtain such measurements will be supplied by HOT. WORK EXCLUDED: Work required for safely accessing the tank is not included in the cost of this project. It will be the contractor's responsibility for providing safe access to all areas of the tank for inspection and testing during the construction. OSHA approved scaffolding and shell buggies will be necessary for the complete access of the tank. Page 3. S81 Proposal PRICE: The cost for the above mentioned service is based on an hourly rate of$65.00/hr for Welding Inspection and Coating Inspection. If contract requires contractor to furnish and pay for Radiographic Testing, then HOT will select the locations of X-rays and grade film. The cost of Services mentioned above is as follows: WELDING AND ERECTION INSPECTION.........................................................$6,240.00 NOTE: BASED ON 96 HOURS(3 HR MIN. CHARGED EACH SITE VISIT) SURFACE PREPARATION AND PAINTING INSPECTION(field)..................................................$4,875.00 NOTE: BASED ON 75 HOURS (3 HR MIN. CHARGED EACH SITE VISIT) SURFACE PREPARATION AND PAINTING INSPECTION(shop)..................................................$3,500.00 NOTE: BASED ON 3 DAYS AT SHOP IN DES MOINES, IOWA (TIME ONLY) TOTAL COST OF SERVICE..............................................................$14,615.00 All work will be conducted and billed at an hourly rate as shown above. The budget cost for conducting the inspection will not exceed the cost above without written approval from the owner/representative. Once the cost approaches the budget cost, the owner will be notified and informed of the remaining work required to complete project TERMS: This proposal is offered to acceptance within 45 days. Payments to be made within 30 days of invoice date. CONDITIONS: This proposal assumes that the tank will be accessible for inspection and that any restrictions requiring special work will affect the cost of this proposal. INSURANCE: HOT to provide insurance certificate upon request. TIME OF PERFORMANCE: All inspection visits will be scheduled with the engineer and contractor if required for performing the necessary inspection and testing. Page 4. S81 Proposal ACCEPTANCE: Should you find this proposal acceptable at the prices, terms, and conditions offered, please indicate your acceptance by signing in the space provided. Executed on this the_ day of 2001. ACCEPTED ACCEPTED en R A. u a, Jr., M r Presiden City Of Round Rock,Texas HOT I ction S vices, Inc.