Contract - Cash Construction - 9/23/2021 Page I of 3 Contract Quantity Adjustment/Change Order rcv,01/16 Department: LIES Project Name: Northeast Downtown Revitalization Date: 8/30/21 City Project Change Order/Quantity ID Number RHB20 Adjustment No. 3 Vendor Cash Construction 217 Kingston Lacy Blvd.-Pflugerville,Texas 78660 (512)251-7872 Company Name Address Phone No. Justification Change Order No.3 is for replacing 6-inch wastewater line in Milam Street and in Alley between Mays and Lampasas Street with 8-inch HDPE wastewater line by pipe bursting. Also replace existing 2-inch waterline in alley between Mays and Lampasas Street. SUMMARY Amount %Change Original Contract Price: $7,823,780.00 Previous Quantity Adjustment(s): $0.00 This Quantity Adjustment: $0.00 Total Quantity Adjustment(s): $0.00 Total Contract Price with Quantity Adjustment(s): $7,823,780.00 Previous Change Order(s): $164,056.70 2% This Change Order: $227,692.50 3% Total Change Order(s)To Date: $391,749.20 5% Adjusted Contract Price [Original Contract Price Plus Quantity Adjustment(s)Plus Change Order(s)]: $8,215,529.20 Difference between Original and Adjusted Contract Prices: $391,749.20 Original Contract Time: 365 Time Adjustment by previous Quan.Adj./Change Order: 0 Time Adjustment by this Quan.Adj./Change Order: 7 New Contract Time: Z7372 — Submitted for Approval Prepared By: Eddie Zapata,Senior Project Manager,City of Round Rock 8 30 21 Signature A6 U Printed Name,Title,Company Date Contractor: ° Michael Stevens Project Manager,Cash Construction $ c 7-1 City Project gnatu Printed Name,Title,Company Date Manager: 'Fi Eddie Zapata,Senior Project Manager Signatu Printed Name,Title Date Mayor/City Mana er Craig Morgan, Mayor Signature Printed Name,Title Date Contract Quantity Adjustment/Change Order e 01,16 Project Name: Northeast DowntownRevitalization Quan.Adj./Change Order No.: 3 Change Order Data Contract Time Adjustment Item# Item Description Unit qty. Unit Price Amount CO 3-1 Mobilization LS 1 $12,000.00 $12,000.00 7 CO 3-2 Pie Burst existing 6-inch Wastewater with 8-inch HDPE LF. 1166 $93.75 $109,312.50 CO 3-3 Reconnect to existing wastewater service lateral Ea. 10 $1,500.00 $15,000.00 CO 3-4 Wastewater Service Saddles Ea. 14 $125.00 $1,750.00 CO 3-5 Road plate rental for wastewater service laterals Ea. 14 $460.00 $6,440.00 CO 3-6 Traffic Control LS 1 $1,500.00 $1,500.00 CO 3-7 Demo and remove existing 2"water line LF. 647 $20.00 $12,940.00 CO 3-8 Install 6"waterline(Complete in lace LF. 647 $100.00 $64,700.00 CO 3-9 Haul off Utility Spoils CY 300 $12.00 $3,600.00 CO 3-10 Temporary Pavement Repair Cold Mix Ton 9 $50.00 $450.00 TOTALS: $227,692.50 7 Page 3 of 3 Contract Quantity Adjustment/Change Order ev Ol 16 Project Name: Northeast Downtown RevitaIization Quan.Adj./Change Order No.: 3 Quantity Adjustment Data Contract Time Adjustment Bid Item# Item Description Unit Unit Price Amount TOTALS: 0. 0