Loading...
Contract - JD Ramming Paving - 6/26/2014Contract Quantity Adjustment/Change Order MV, CW12 Department: Transportation Project Name: 2012 Street Maintenance Project Overlay City Project ID Number MNT12 Justification Date: 5/21/14 Change Order/Quantity Adjustment No. 1 Pagc I of 3 quantity Adjustment/Change Order * 1 is needed to adjust finall quanities that was required to complete nessesary work for the project, additional work included; a deduct in asphalt overlay, level -up and minor repair. There was an increase In concrete fiat work including additional sidewalk, driveways and curb & gutter that was required to replaced associated with the project, specifically In the Eagles Nest area. SUMMARY Amount % Change Original Contract Price: $4,771,800.00 = Previous Quantity Adjustment(s): $0.00 This Quantity Adjustment. $273,762.80 Total Quantity Adjustment(s): Total Contract Price with Quantity Adjustment(s): $4,771,800.00 Previous Change Order(s): 0.00 This Change Order: $0.00 0.00 Total Change Order(s) To Date: 0.00 Adjusted Contract Price [Original Contract Price Plus - 1. Quantity Adjustments) Phis Change Order(s)]: $5,0451562.80 Difference behmnn Original and Adjusted Contract Primo: $273,782.80 Original Contract Time: 325 Time Adjustment by previous Quan. Adj./Change Order. Time Adjustment by this Quan. Adj./Change Order. 240 New Contract Time: 565 'Sdbm1tbW,&r A ji6io al City Project Manager: Mayor/City In,� Manager Signature R-2014-1533 W .26 . —/.C/ Contract Quantity Adjustment/Change Order - �+`nwcxrcxw ter,:}911i Project Name: 2012 Street Maintenance Project Overlay Quan. Adj./Change Order No.: Chan®e Order Data Page 2 of 3 Contract rime Adjustment M it Page 3 of 3 Contract Quantity Adjustment/Change Order rer, �AIrY Project Name: 2012 Street Maintenance Project Overlay Quart. Adj./Change Order No.: Ouanttty Adiustment Data Bid item # item Description Unit Qty. Unit Price Contract Time Amount Adjustment ;. f 1 2" Overlay Type D HMAC -6130.4 $ 86.00 -$527,216.00 2 Pavement Repairs 500 $ 100.00 $50,000.00 3 Minor Repairs -250 $ 150.00 -$37,500.00 4 Level U -100 $ 150.00 -$15,000.00 5 Ede Millin -4820 $ 1.55 -$7,471.00 6 Surface Millin -8180 $ 4.50 -$36,810.00 7 Remove & Replace Curb & Gutter 4172 $ 45.00 $187,740.00 8 Remove & Replace Driveway 9369 $ 24.00 $224,856.00 9 Remove & Replace Sidewalk 34970 $ 14.50 $507,065.00 10 Manhole Adjustment -108 $ 450.00 -$48,600.00 11 Valve Adjustment -5 $ 125.00 -$625.00 12 Concrete Curb Ram 4 $ 2.200.00 $8,800.00 13 Remove & Replace Valley Gutter -543 $ 40.00 -$21,720.00 14 Traffic Control 0 0 $ 4.500.00 $0.00 IS Thermoplastic Pavement Markin -10818 $ 0.90 -$9,736.20 240 $273,782.80 240