Loading...
Contract - Cash Construction - 7/23/2015 ti Page I of 3 Contract Quantity Adjustment/Change Order rev,08/12 Department: Transportation Project Name: CORR SWDT Ph 5A Date: 6/23/15 City Project Change Order/Quantity ID Number SWDT5 Adjustment No. 1 Justification Additional quantities for water,wastewater,and electric for Main Street, Liberty,and Mays. Some additional change order electrical items(bore at Liberty, and Brown,Grande 4"Communication lines,and new electrical manholes). Some misc change order items(gazebo remove,fix exiting WL leak at Anderson..ect). SUMMARY Amount %Change Original Contract Price: $13,773,063.00 Previous Quantity Adjustment(s): $0.00 This Quantity Adjustment: $567,481.00 Total Quantity Adjustment(s): $567,481.00 Total Contract Price with Quantity Adjustment(s): $14,340,544.00 Previous Change Order(s): $0.00 0% This Change Order: $132,905.00 1% Total Change Order(s)To Date: $132,905.00 1% Adjusted Contract Price [Original Contract Price Plus Quantity Adjustment(s) Plus Change Order(s)]: r $14,473,449.00 Difference between Original and Adjusted Contract Prices: $700,386.00 Original Contract Time: 720 Calendar Days Time Adjustment by previous Quan.Adj./Change Order: 0 Calendar Days Time Adjustment by this Quan.Adj./Change Order: 35 Calendar Days New Contract Time: 755 Calendar Days Submitted for Approval Prepared By: B.J.Cash,Cash Construction LQ Signa re Printed Name,Title,Company Date Q Approvals Contractor: '" B.J.Cash,Cash Construction LQ /Z�r ir S' Sig Vure Printed Name,Title,Company Date City Project t Manager: Z& Bill Stablein, Project Manager,CORR Si a re Printed Name,Title Date Mayor/City ,�✓L,�� Manager Alan McGraw, Mayor,CORR L�.J %ffature Printed Name,Title Date Pa-e 2 of 3 Contract Quantity Adjustment/Change Order rev,os/12 Project Name: CORR SWDT Ph 5A Quan.Adj./Change Order No.: 1 Change Order Data Contract Time Adjustment Item# Item Description Unit Qty. Unit Price Amount Da s 305 Bore EO Duct Bank LF 235 $222.00 $52,170.00 306 Grande Bore at Church 1 EA 4"PVC LF 225 $131.00 $29,475.00 0 307 Grande Manholes EA 2 $9,160.00 $18,320.00 308 AT&T Manhole(Material Only) EA 4 $6,675.00 $26,700.00 309 Remove and Fill Trash Area on Mays LS 1 $4,390.00 $4,390.00 310 Fix Existing Leak at Anderson Ave. LS 1 $6,815.00 $6,815.00 311 Gazebo Remove LS 1 $2,135.00 $2,135.00 Deduction of Material Cost for Oncor 12'x 12'Octaganol 312 Manhole LS -1 $7,100.00 -$7,100.00 $0.00 $0.00 $0.00 $0.00 TOTALS: $132,905.00 0 Page 3 of 3 Contract Quantity Adjustment/Change Order ev,08/12 Project Name: CORR SWDT Ph 5A Quan.Adj./Change Order No.: 1 Quantity Adjustment Data Contract Time Adjustment Bid Item# Item Description Unit Qty. Unit Price Amount Water Items 168 12"C-900 SDR 14 PVC Pipe LF 828 $210.00 $173,880.00 21 182 12"MJ Gate Valve w/Valve Box EA 1 14 $3,000.00 $42,000.00 177 8"C-900 SDR 14 PVC Pipe LF 240 $200.00 $48,000.00 186 8"MJ Gate Valve w/Valve Box EA 7 $2,000.00 $14,000.00 174 6"C-900 SDR 14 PVC Pipe LF 20 $200.00 $4,000.00 185 6"MJ Gate Valve w/Valve Box EA 1 $1,400.00 $1,400.00 172 4"C-900 SDR 14 PVC Pipe LF 110 $190.00 $20,900.00 184 4"MJ Gate Valve w/Valve Box EA 2 $1,300.00 $2,600.00 187 Fire Hydrant Assembly EA 2 $6,000.00 $12,000.00 173 4"MJ Cap(4 EA 4"Cap&6 EA 8"Cap) EA 10 $250.00 $2,500.00 85 8x8 Tapping Sleeve and Valve with 12x8 Reducer EA 1 $6,500.00 $6,500.00 Wastewater Items Pipe,8"Dia. PVC ASTM D2241 SDR26 WW(all depths), 68 including excavation and backfill LF 245 $140.00 $34,300.00 7 New WW Manhole,48"Dia.,including ring adjustments, 66 lid, interior coatings,etc. EA 3 $6,500.00 $19,500.00 Clean Out Assembly for Pipe,8"Dia. PVC ASTM D2241 SDR26 WW(all depths), including Excavation and 70 Backfill EA 5 $400.00 $2,000.00 Electric Items One each 4-inch Communication line to/from Duct Bank to service provider manhole/handhole(for Additional 90 Grande 4"Comm. Line) LF 1687 $63.00 $106,281.00 7 98 Round Rock Duct Bank 52"Manhole EA 2 $12,000.00 $24,000.00 100 Oncor 12'x 12'Octaganol Manhole. EA 1 $30,000.00 $30,000.00 112 AT&T-Manhole EA 1 $12,000.00 $12,000.00 17"x30"x12"concrete electrical pull box plus AASHTO H- 20 traffic-rated steel non-slip cover,as specified, 117 complete in place(for Grande Handholes) EA 3 $2,000.00 $6,000.00 240 Oncor Pedestal EA 3 $500.00 $1,500.00 Coordination with Time Warner Cable including coordination of installation of wiring(For Grande 105 Communications) EA 1 $9,000.00 $9,000.00 266 PVC CONDUIT(SCH 80)(2")(TXDOT-618) LF 235 $30.00 $7,050.00 267 PVC CONDUIT(SCH 80)(3")(TXDOT-618) LF 1575 $30.00 $47,250.00 268 PVC CONDUIT(SCH 80)(4")(TXDOT-618) LF -200 $32.00 -$6,400.00 110 Time Warner Telecommunications-Manhole EA -1 $12,000.00 -$12,000.00 94 EO-Duct Bank(Electrical&Communications) LF -235 $180.00 -$42,300.00 Stripping $0.00 201 Elim Ext Pav Mrk&Mrks(24") LF 190 $8.00 $1,520.00 $0.00 TOTALS: $567,481.001 35